USPTO serial 79330047
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Richard LaCava
Richard LaCava ArentFox Schiff LLP1301 Avenue of the Americas, 42nd FloorNew York, NY 10019UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and parts of machines used in the production and processing of concrete and concrete elements, namely mixing and precast concrete casting machines and structural parts thereof, mold and casting bed preparation and cleaning machines and structural parts thereof, and precast element moving and lifting machines and structural parts thereof; Machines in the nature of concrete and concrete element finishing machines, concrete construction machines for the manufacture and production of concrete elements, concrete panels and walls; Industrial robots for manufacturing | ACTIVE | — |
| 009 | Computers; downloadable computer software for reinforcement calculation, storage and inventory management, truckload planning, monitoring installation of precast concrete elements, slabs and panels; downloadable mobile software for accessing precast manufacturing data and for controlling functionalities thereof; recorded manufacturing software for controlling concrete mixing, casting and finishing machines and slab positioning in factory environment; downloadable computer software for optimization of precast concrete production, creating reports and for visualization of factory operations data, monitoring capacity in precast factories, managing materials in precast factories, managing quality in precast factories; downloadable software for financial and personnel management of projects and staffing and for monitoring and calculating profitability of projects; sensors in the nature of temperature sensors, humidity sensors, hardness sensors and sensors for obtaining data on progressing of the casting process on a precast concrete production line, measurement and signalling devices in the nature of devices for monitoring casting process and for measuring and receiving and transmitting measurement data between production control software and machines and equipment in precast concrete factory; downloadable computer software for control, management and maintenance of machines, devices and equipment in concrete and construction industry in the nature of collecting and processing data concerning wear and tear for predicting maintenance need and lifeline | ACTIVE | — |
| 037 | Building construction; repair and maintenance of machines, computers, tools and appliances in the construction industry, namely installation, repair and maintenance of computers, installation, repair and maintenance of precast concrete casting machines, machines for preparing casting beds and molds, machines for moving and lifting raw materials and precast concrete elements; repair and maintenance appliances that are for drying and storing precast concrete elements; repair, installation and maintenance of industrial robots repair and maintenance of concrete manufacturing machines and appliances and electrical appliance installation and repair for production lines and for factories, in the nature of electric appliance installation and repair | ACTIVE | — |
| 042 | Scientific and technological services namely research, design and development of precast machinery and precast concrete factory automation, in the field of construction; Scientific research and technological services, namely civil engineering services and scientific carbon footprint evaluation services in the field of concrete manufacturing, production and processing; Scientific and technological services, namely design and development of computer software and computer hardware and machines for precast concrete manufacturing, processing, moving, drying, and storing; engineering services; Research, development and design services, namely research, development and design of precast concrete characteristics, precast concrete mixing machines, casting machines, cast preparation machines, concrete element moving and lifting machines and optimal drying and storing facilities all relating to manufacturing, production and processing of concrete; Scientific research services, namely research of software and hardware requirements and optimization relating to the computerized automatization of industrial processes; design and development of computer hardware and software; Software as a Service (SaaS) services featuring software for reinforcement calculation, for storage and inventory management, for truckload planning, for monitoring installation of precast concrete elements, slabs and panels, for accessing precast manufacturing data and for controlling functionalities thereof, for controlling concrete mixing, casting and finishing machines and slab positioning in factory environment, for optimization of precast concrete production, for creating reports and for visualization of factory operations data, for monitoring capacity in precast factories, for managing materials in precast factories, for managing quality in precast factories, for management of projects and staffing and for monitoring and calculating profitability of projects, for control, management and maintenance of machines, devices and equipment in concrete and construction industry in the nature of collecting and processing data concerning wear and tear for predicting maintenance need and lifeline; technical and technological consultation, namely engineering consulting related to engineering issues for manufacturing of concrete elements; technical and technological consulting, namely computer hardware consulting and software consulting; Installation, updating and maintenance of computer software | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 26, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 26, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 30, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 30, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 14, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 14, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 14, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 27, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 27, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 7, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 18, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 18, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 18, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 18, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 18, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 19, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 19, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 19, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 26, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Aug 26, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 26, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Aug 26, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 26, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 26, 2022 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Aug 23, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 3, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 3, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 2, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 1, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 26, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 8, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 4, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 30, 2021 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |