USPTO serial 79330922
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
ZEG Zweirad-Einkaufs-Genossenschaft eG
DE
Other trademarks owned by ZEG Zweirad-Einkaufs-Genossenschaft eG
ZEG Zweirad-Einkaufs-Genossenschaft eG
DE
Other trademarks owned by ZEG Zweirad-Einkaufs-Genossenschaft eG
ZEG Zweirad-Einkaufs-Genossenschaft eG
DE
Other trademarks owned by ZEG Zweirad-Einkaufs-Genossenschaft eG
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Keith Orum
Keith Orum ORUMS819 LOVERS LNELROY, WI 53929UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 012 | Two-wheeled vehicles, namely, pedal-operated two-wheeled vehicles in the nature of bicycles; electric bicycles, namely, two wheeled motorized vehicles; bicycles; electric bicycles; electric bikes; electric motorcycles; mountain bikes; children's bicycles; non-motorized two-wheeled bicycles with hand brakes pushed, not pedal-operated; racing bicycles; tandem bicycles; touring bicycles; delivery bicycles; transport bicycles; delivery motorcycles; motorized delivery bicycles; road racing bicycles; tricycles not being toys; motorized delivery tricycles, not being toys; delivery bicycles and structural parts therefor; unicycles and structural parts therefor; mini-bikes; electric vehicles, namely, cycles with electric motor in the nature of electric motor cycles; push scooters; structural parts of bicycles, electric bicycles, electric bikes and electric motorcycles; structural parts for bicycles, namely, bicycle wheels, bicycle wheel rims and structural parts therefor, drive chains, handlebars and handlebar grips, brake shoes, forks, front fork joints, sprockets, derailleurs, pedals, fitted seat covers and kickstands for bicycles; bicycle parts, electric bicycle parts and electric bike parts, namely, bicycle bells, brakes, chains, frames, gears, gear wheels, handlebar grips, horns, drive chains, disk wheels, handle bar ends, brake shoes, speed change gears, fork crown cover, forks, front fork joints, handle bar stems, sprockets, bicycle pedals, saddles, bicycle seat posts, bicycle stands, kickstands and pumps; bicycle pumps; mudguards for two-wheeled motor vehicles; mudguards for bicycles; bicycle racks for vehicles; water bottle holders for bicycles; bicycle wheels, wheel hubs, bicycle wheel rims and structural parts therefor; front and rear bicycle rack packs; handlebars for two-wheeled motor vehicles; handlebars for bicycles; motors for bicycles; saddle covers for bicycles; spoke clips and spokes for bicycle wheels; tires for two-wheeled motor vehicles; tires for two-wheeled bicycles; frames, for luggage carriers, for bicycles; wheels for bicycles; wheels for cycles; frames for bicycles; frames for electric bicycles; frames for electric bikes; frames for delivery bicycles; frames for transport bicycles; trailers for transporting bicycles; trailer hitches for bicycles; front and rear bicycle rack packs, caddies in the nature of pannier bags for bicycles, baskets and saddle bags adapted for bicycles; electric motors for bicycles and bikes; inner tubes for cycle wheels, namely, inner tubes for bicycle tires; panniers adapted for cycles; panniers adapted for bicycles; luggage racks for cycles; saddlebags adapted for bicycles; tires for children's bicycles; safety pads for bicycles; child carrying trailers for use in transporting children while cycling, hiking, jogging, walking, skiing, snow shoeing or skating; directional signals for bicycles, electric bicycles, transport bicycles and delivery bicycles; safety seats for infants and children for bicycles, transport bicycles and delivery bicycles; child carrying trailers for use in transporting children that attach to land vehicles; fitted covers for bicycles, electric bicycles, transport bicycles and delivery bicycles | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 26, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 2, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 1, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 28, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 28, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Feb 28, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 3, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 13, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 13, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 12, 2022 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Nov 23, 2022 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 23, 2022 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 23, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 7, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 5, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 4, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 4, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 25, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 4, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 4, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 22, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 21, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 14, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 25, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 21, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 19, 2022 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jan 13, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |