Drawing for CUIRASSIER

USPTO serial 79331631

CUIRASSIER

Reviewed by CopyMark Law Group

Reg. 7070668Status 700Registered
Filing date
Status date
Registration date
Jun 6, 2023
Examiner
SEARS, DAVID
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with CUIRASSIER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alice Denenberg

Alice Denenberg Gottlieb, Rackman & Reisman, P.C.270 Madison Ave., 8th FloorNew York, NY 10016UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; Metal building materials, namely, stainless steel, and liquid metal elastomer; metal supports for use in the construction of barriers that prevent the penetration of water and any other liquid; flood barriers of metalACTIVE—
009Instruments for measuring water levels; Electric measuring apparatus, namely, apparatus for measuring water levels, water mass, retention basins and any industrial and chemical liquids; sensors, detectors and monitoring instruments, namely, pressure sensor, laser sensors for water, motion sensor, turbidity control sensor and sensor for calculating the flow velocity of a liquid; Electronic-based instruments for measuring environmental parameters including humidity, water level, movements, shocks and debris impacts, and liquid current; level indicators for water and any other liquid; Luminous and mechanical warning signs; pressure measuring apparatus; observation instruments, namely a downloadable computer software to alert users on protection from flooding; electric and electronic alarms for detecting the presence and level of water and any other liquid; Remote control for remote controlled valvesACTIVE—
017Packing and insulating materials of rubber or plastic; caulking materials to prevent and resist water, mud and or other liquid; Sealing and insulating materialsACTIVE—
019Prefabricated building assemblies, not of metal; transportable buildings not of metal; Construction materials, namely, thermoformed plastic, injection molded plastic, and composite plastic; flood protection apparatus and systems, being non-metallic building elements, namely, thermoformed plastic, injection molded plastic, and composite plastic; devices for preventing water and all liquids from entering buildings, namely, non-metal free-standing barriers; temporary devices for protection against infiltrations and floods, namely non-metallic ready-to-assemble protection barriers; non-metallic semi-permanent barriers for flood prevention and portable flood barriers; non-metallic transportable buildings, namely, mobile protective barriers made of plastic against infiltration and floods; non-metallic transportable buildings, namely, flexible modular protection barriers for fast installation against floods; Portable non-metal free-standing barriers to absorb flood water; replacement parts thereforACTIVE—
037Construction, installation, repair and maintenance of flood protection systems; installation, repair and maintenance of flood warning systems; civil engineering in connection with the prevention of flooding of land and buildings; advisory services with respect to the installation of flood prevention equipment; Consultation and advice in the field of installation of flood prevention equipment; Flood protection system construction, installation, repair, and maintenance information and consultation servicesACTIVE—
042Design and development of flood protection systems; design and development of engineering works for flood prevention; Engineering advisory services with respect to flood prevention; technical advisory services with respect to civil engineering; Scientific and industrial research of methods for detecting and preventing flooding; design and development of computers and software; design and development of computer hardware and software for flood warning systems; providing temporary use of non-downloadable software for flood prevention; software as a service services featuring software for flood monitoring and flood warning services; Consultation and advice in the field of design and development of flood prevention systems, and flood prevention computer softwareACTIVE—
045Safety services for the civil protection of property and persons; Security services for buildings, namely security services for the physical protection of tangible property; Security threat analysis for protecting personal safety and tangible property; legal advice for responding to calls for tenders with respect to environmental risksACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 3, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 8, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 8, 2023FIMPFINAL DISPOSITION PROCESSED—
Sep 6, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 6, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 6, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 19, 2023GPNXNOTIFICATION PROCESSED BY IB—
Mar 21, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 21, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 1, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 1, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 1, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 16, 2023CRSNCORRECTION SENT TO IB—
Feb 16, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 16, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Feb 16, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 16, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 16, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 15, 2023CRCRCORRECTION CREATED FOR IB—
Feb 15, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Feb 15, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 15, 2023ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Feb 15, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 15, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 15, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Nov 8, 2022RFNTREFUSAL PROCESSED BY IB—
Oct 17, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 17, 2022RFRRREFUSAL PROCESSED BY MPU—
Aug 25, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 24, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 3, 2022RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Aug 3, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 2, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 27, 2022DOCKASSIGNED TO EXAMINER—
Feb 4, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 31, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 27, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance