USPTO serial 79331657
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Dmitriy O. Makarov
Dmitriy O. Makarov IpHorgan Ltd.195 Arlington Heights Rd, Suite #125Buffalo Grove, IL 60089-1768UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 035 | Business management services and consultancy; business administration services; business research and information; advertising consultancy services to promote public awareness; advertising; economic studies for business purposes; consultancy services relating to the procurement of goods and services; consultancy services relating to the conduct of surveys to assess public consultations; compilation of statistics; compilation of information into computer databases; cost price analysis services | ACTIVE | — |
| 037 | Building construction services; repair, maintenance and installation of buildings and building construction machinery; real estate development; consultancy, advisory and information services relating to real estate development; consultancy, advisory and information services relating to the construction of public works; consultancy, information and advisory services relating to the repair, alteration, extension, restoration, redevelopment or demolition of buildings and monuments of architectural or historic interest; consultancy, information and advisory services relating to development of property in conservation areas and areas of architectural or historic interest; consultancy, advisory and information services in connection with the construction of flood and coastal defences; consultancy, advisory and information services in connection with the construction of sustainable urban drainage systems; consultancy and advisory services relating to the safe removal of asbestos | ACTIVE | — |
| 042 | Engineering services; research and consultancy services in the fields of environmental science, ecology, hydrology, petrophysics and geosciences, and mechanical, safety, fire and electrical engineering; scientific research and technological consultancy, advisory and information services relating to the carbon sequestration, environmental protection, environmental management, pollution, indoor and outdoor air quality, climate change, sustainability of natural resources and environmental impact; environmental hazard assessment; conducting environmental surveys; architectural services; urban planning in the nature of town and country planning; consultancy, advisory and information services relating to architecture, landscape architecture, town and country planning, urban regeneration and building design; geological research and surveys; consultancy, advisory and information services relating to geo-environmental and geotechnical engineering, hydrogeology, geology, seismic operations and stratigraphy; consultancy, advisory and information services relating to civil and structural engineering; agricultural research services; land surveying; scientific research and technological consultancy, advisory and information services relating to contaminated land, land-use, land quality, groundwater and land remediation; scientific research and technological consultancy, advisory and information services relating to the use of energy, energy saving, energy management and the conservation of energy; consultancy and advisory services relating to technical and geological research, surveys and analysis for the purposes of quantifying and reporting on economically recoverably energy resources; consultancy, advisory and information services relating to engineering, planning and environmental impact assessments all relating to the development and operation of renewable energy installations including windfarms, biomass and biofuel plants, solar power installations, wave and tidal power installations, combined heat and power installations and installations for generating energy from waste; consultancy, advisory and information services relating to nuclear engineering, planning for nuclear power plants and research into the environmental impact of nuclear power stations; engineering services, namely design of flood and coastal defences, reservoirs and drainage systems; consultancy, advisory and information services in connection with engineering works for the prevention of floods and coastal erosion, reservoir engineering and the engineering of sustainable urban drainage systems; consultancy, advisory and information services in connection with testing materials and property for the presence of asbestos, assessment of risk associated with the presence of asbestos; sampling and analytical services relating to asbestos and the preparation of survey reports relating to asbestos; scientific and technological consultancy services relating to acoustics, noise and vibration; scientific laboratory services; technical project management in the field of environmental science, ecology, hydrology, petrophysics and geosciences, mechanical, safety, fire and electrical engineering; consultancy, advisory and information services in connection with the design of pipelines for water, oil and gas; scientific and technological consultancy services relating to pipelines for water, oil and gas including leakage detection; consultancy, advisory and information services in connection with the design of roads and highways; consultancy, advisory and information services relating to the engineering of sewer systems, the conduct of sewage and water flow monitoring, water quality sampling and testing the efficiency of water pumps; consultancy, advisory and information services in connection with the detection, location, marking and reporting of leaks within water distribution networks; scientific, engineering and technical consultancy services relating to the planning, development, distribution and optimum utilising of water resources; scientific and technological consultancy services relating to oil and gas well operations; water engineering; petroleum engineering; technological consultancy services in connection with environmental liability and quality management; research services in the field of social science; industrial, scientific and technological development services and research | ACTIVE | — |
| 045 | Consultancy and advisory services relating to health and safety laws and regulations, the development of health and safety policies and procedures and health and safety risk assessments | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 28, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 3, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 3, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 25, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 25, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Apr 25, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 7, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 7, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 7, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 18, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 18, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 18, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 3, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 7, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 7, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 7, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 7, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 28, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 28, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 28, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 28, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 22, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 21, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 21, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 21, 2022 | RFNP | REFUSAL PROCESSED BY IB | — |
| Nov 2, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 1, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 3, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 2, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 31, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 9, 2022 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Feb 1, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 28, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 27, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |