Drawing for ECOCOCON

USPTO serial 79332677

ECOCOCON

Reviewed by CopyMark Law Group

Reg. 7088879Status 700Registered
Filing date
Status date
Registration date
Jun 27, 2023
Examiner
EISNACH, MICHAEL PATRICK
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ECOCOCON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Timur Slonim

Timur Slonim Law Office of Timur E. Slonim, Esq.86 Reno Ave,Staten Island, NY 10306

Goods and services

ClassDescriptionStatusFirst use
017Insulators, namely, building insulation; soundproofing materials; weatherstripping compositions, namely, weatherstripping for use in automobiles, homes; non-conducting materials for retaining heat, namely, glass fiber insulation for hot water heaters; insulating materials; compositions to prevent the radiation of heat; insulating refractory materials, namely, glass fiber insulation for hot water heaters; cotton wool for packing being caulking; mineral wool being insulationACTIVE—
019Framework, not of metal, for building; prefabricated, transportable buildings, not of metal; building materials, not of metal, namely, lumber for building; construction materials, not of metal, namely, lumber for building; huts, namely, transportable buildings of lumber; furrings of wood; concrete building elements, namely, concrete for building; wood, semi-worked; building timber; manufactured timber; chimneys, not of metal; windows, not of metal; doors, not of metal; props, not of metal, namely, wood beams; asphalt felt for building; porches, not of metal for building; wall claddings, not of metal, for building; wall linings, not of metal, for building; ceilings, not of metal; reeds being lumber for building; latticework, not of metal; reinforcing materials, not of metal, for building; shuttering, not of metal, for concrete; window frames, not of metal; door frames, not of metal; door casings, not of metal; staircases, not of metal; building panels, not of metal; prefabricated houses, not of metal; cladding, not of metal, for buildingACTIVE—
037Construction of buildings; building sealing; building insulating, namely,installation of building insulation; providing construction information; construction consultancyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 24, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 28, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 28, 2023FIMPFINAL DISPOSITION PROCESSED—
Sep 27, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 27, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 27, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 13, 2023GPNXNOTIFICATION PROCESSED BY IB—
Apr 11, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 11, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 22, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 22, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 22, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 6, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 4, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 3, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 3, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 5, 2022RFNTREFUSAL PROCESSED BY IB—
Nov 15, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 15, 2022RFRRREFUSAL PROCESSED BY MPU—
Sep 15, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 14, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 7, 2022DOCKASSIGNED TO EXAMINER—
Feb 11, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 7, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 3, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance