Drawing for MAERZ ECOKILN

USPTO serial 79333510

MAERZ ECOKILN

Reviewed by CopyMark Law Group

Reg. 6988119Status 700Registered
Filing date
Status date
Registration date
Feb 28, 2023
Examiner
HAYS, CANDACE W
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MAERZ ECOKILN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
011Industrial furnaces and structural and replacement parts therefor, auxiliary installations for firing limestone and dolomite, namely, shaft furnaces, high-temperature furnaces for sintering, in particular for sintering dolomite and magnesite, for manufacturing tabular alumina, shelf furnaces for calcining carbonatesACTIVE—
037Installation, maintenance and repair of industrial furnaces and parts therefor, auxiliary installations for firing limestone and dolomite, namely, shaft furnaces, high-temperature furnaces for sintering dolomite and magnesite and for manufacturing tabular alumina, and shelf furnaces for calcining carbonatesACTIVE—
042Engineering, technical consultancy, planning, namely, construction drafting and technical project planning, in the nature of industrial design, technical analysis of others to determine conformity with certification standards, surveying, commissioning being the design and development of industrial furnaces and parts therefor, auxiliary installations for firing limestone and dolomite, namely, shaft furnaces, high-temperature furnaces for sintering dolomite and magnesite and for manufacturing tabular alumina, and shelf furnaces for calcining carbonates; quality monitoring, namely, quality controls for others of industrial furnaces and parts therefor, auxiliary installations for firing limestone and dolomite, namely, shaft furnaces, high-temperature furnaces for sintering dolomite and magnesite and for manufacturing tabular alumina, and shelf furnaces for calcining carbonatesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 24, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 26, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 2, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 2, 2023FIMPFINAL DISPOSITION PROCESSED—
May 28, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 28, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Feb 28, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 17, 2023DOCKASSIGNED TO EXAMINER—
Dec 13, 2022GPNXNOTIFICATION PROCESSED BY IB—
Dec 13, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 13, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 23, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 23, 2022OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Nov 23, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 12, 2022CHLDCHANGE OF OWNER RECEIVED FROM IB—
Nov 9, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 11, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 10, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 10, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 7, 2022RFNTREFUSAL PROCESSED BY IB—
May 17, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 17, 2022RFRRREFUSAL PROCESSED BY MPU—
Apr 5, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 4, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 27, 2022DOCKASSIGNED TO EXAMINER—
Feb 22, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 18, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 17, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance