Drawing for BRC SOLAR

USPTO serial 79333831

BRC SOLAR

Reviewed by CopyMark Law Group

Reg. 7232447Status 700Registered
Filing date
Status date
Registration date
Dec 5, 2023
Examiner
BERGER, MAGDALENA
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with BRC SOLAR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Miriam D. Trudell

Miriam D. Trudell Davis Graham & Stubbs LLC3400 Walnut Street, Suite 700Denver, CO 80205United States

Goods and services

ClassDescriptionStatusFirst use
006Metals and metal alloys; building materials of metal for mounting solar panels; building materials of metal, namely, substrates primarily of metal for supporting solar cells, photovoltaic cells and solar collectors and solar panel mounts; profiles made of aluminum; screw foundations in the nature of pilings of metal; fixing materials of metal, namely, frameworks, supports being construction elements, posts, poles, masts being posts, profiles and frames, each being of metal and for building; transportable buildings of metal; material of metal for railway tracks; metal special mounting brackets for solar energy systems and solar panels; non-electric cables and wires of common metal; ironmongery being small items of metal hardware, namely, metal brackets, metal washers, and metal nuts for construction purposes; pipes and tubes of metalACTIVE—
009Weighing apparatus and instruments, measuring apparatus and instruments, namely, apparatus for measuring pressure, temperature, wind speed and accumulation of snow, thermometers not for medical use, anemometers, accelerometers, detecting apparatus and instruments, namely, apparatus for detecting pressure, temperature, wind speed and acceleration of snow, instruments for detecting and measuring two-dimensional distribution of force and pressure, all for conducting, distributing, transforming, accumulating and regulating electricity; electric measuring apparatus in the nature of electricity meters; electric apparatus for analysis in relation to circulation of electricity; batteries being cells; electric storage battery; inverters; electronic power regulators, namely, voltage regulators for electric power, charge regulators and inverse regulators, current inverters; electric circuit boards and electronic printed circuit plates; apparatus for distributing electricity, namely, electricity distribution consoles, power distributing boxes, switchboards; electric control circuits for solar collectors, solar panels and photovoltaic systems; electric components and electronic components for use with photovoltaic systems, local energy systems, charging stations for electric vehicles, inverters, storage systems for electricity, solar collectors and solar panels; electronic circuits and electrical circuits; apparatus for improving energy efficiency, namely, energy submeters for tracking and monitoring energy usage, electric control devices for energy management; DC/DC power converters and commutators; DC/AC electric converters; DC/DC power converters; integrated electrical circuits; converters, namely, frequency converters, electric converters, electric power converters; load controllers, namely, electricity router for managing and optimizing energy loads; power regulator, namely, voltage regulator, induction voltage regulators; printed circuit boards provided with integrated circuits; photovoltaic apparatus, namely, photovoltaic inverters, solar modules for production of electricity and photovoltaic installations for the production of solar electricity formed therefrom; photovoltaic installations for the production of solar electricity; solar panels for electricity production; photovoltaic modules; photovoltaic converters; processors, namely, micro processors, signal processors, data processors; application processors in the nature of data processors, signal processors, micro processors; data processors; communication processors, namely, data processors, digital signal processors; apparatus for processing signals, namely, data processors, digital signal processors; voltage-regulating apparatus; voltage regulator; voltage transformers; electronic control circuits for solar collectors and solar panels; electronic printed control circuit plate; converters being photovoltaic roofing members, photovoltaic solar modules, photovoltaic cladding panels, photovoltaic solar hybrid modules, photovoltaic thermal hybrid modules, photovoltaic thermal modules; electric converters; electricity inverters; DC/DC converter being direct current converters; computer hardware; microprocessors; downloadable software for configuring and designing photovoltaic and solar energy systems in the field of local energy systems; downloadable computer software for configuring and designing solar energy systems; downloadable computer software for communicating with electric inverters in photovoltaic installations; artificial intelligence apparatus, namely, computers; downloadable software using artificial intelligence for analyzing, configuring, designing photovoltaic and solar energy systems in the field of local energy systems; downloadable interactive software using artificial intelligence for analyzing, configuring, designing photovoltaic and solar energy systems in the field of local energy systems; downloadable algorithm software for operating and controlling photovoltaic installations and solar panels; downloadable measuring technology software for measuring electricity, pressure, temperature, wind speed and accumulation of snow in the field of photovoltaic installations and solar panels; electrical current and voltage sensors and electric wire communication actuators with main unit/automation unit for field bus systems; electronic data loggers for recording and transmitting data from energy equipment installations; frames and supports specially adapted for use with solar panelsACTIVE—
019Building materials, not of metal, for mounting solar panels, namely, nails, screws, nuts, bolts, clips, clamps, lugs, fasteners, mounting brackets, frames, rods and rails; rigid pipes, not of metal, for building; moldings for building construction not of metal; asphalt, pitch and bitumen; transportable buildings, not of metal; monuments, not of metal; roofing, not of metal, incorporating photovoltaic cellsACTIVE—
035Company business management planning and business organization services as well as business advisory services and company business organization in the field of renewable energy installations and parks; organizational business project management with respect to renewable energy installations and parks; services for procuring contracts with electricity suppliers; retail store and wholesale store services for photovoltaic apparatus and photovoltaic installations being goods and parts and accessories for the aforementioned installationsACTIVE—
037Repair services, namely, repairing individual components of photovoltaic installations and solar thermal energy installations; installation services, namely, installation services for photovoltaic installations and solar panels for generating electricity; erecting solar energy systems; construction, cleaning, repair, maintenance and servicing of solar energy systems and installations and parks for renewable energy installations; maintenance, servicing and repair of apparatus and installations for generating electrical power; installation, repair and maintenance of measuring technology apparatus and measuring instruments for solar energy systems and solar panels for generating electricity; scaffolding erection, construction and repair; roofing servicesACTIVE—
039Transport by air, bus, railway, truck, boat and marine transport; packaging and storage of merchandise for others; transmission and transport of electricity, heat, gas and water; supplying consumers with electricity, heat, gas and water; utility services, namely, electricity power grid load shifting; energy supply and distribution; electricity supply services by electricity distribution; electricity distribution and transmissionACTIVE—
040Treatment of materials in the nature of metal, chemicals; treatment of materials by laser beam; treatment of materials for the manufacture of solar panels and photovoltaic systems; production of energy; custom manufacture of semiconductor components, semiconductor apparatus and semiconductor circuits on request and according to a customer's specifications; production of electricity from solar energy; rental of electricity generating installations; rental of equipment for generating electrical energy; rental of equipment for energy production; consultant services regarding electrical energy production; consultant services regarding energy production; services provided by technical consultants in the field of solar power productionACTIVE—
042Scientific and technological services, namely, research, technology planning, development and design in the fields of solar energy and renewable energy as well as research and design services in the fields of solar energy and renewable energy; industrial analysis and research services, namely, industrial research in the fields of solar energy and renewable energy; design and development of computer hardware and software; providing software as a service (SaaS) services featuring software for analyzing, configuring, designing photovoltaic and solar energy systems in the fields of local energy management, photovoltaic and solar energy systems and rental of computer software; design and development of software for control, regulation and monitoring of solar energy systems; research in the field of artificial intelligence; software as a Service (SaaS) services featuring software using artificial intelligence for analyzing, configuring, designing photovoltaic and solar energy systems in the field of local energy management, photovoltaic and solar energy systems; providing temporary use of on-line non-downloadable computer programs using artificial intelligence for analyzing, configuring, designing photovoltaic and solar energy systems in the field of data networks to manage energy in a local environment and photovoltaic and solar energy systems; developing and planning technical solutions and products in the field of sensor systems and measurement technology; design services in the field of sensor systems and measurement technology; developing electrical and electromechanical systems; developing and implementing hardware and software for electrical and electromechanical systems for optimizing hardware and software interfaces, all of the aforementioned in the field of solar energyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 18, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 18, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 18, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 26, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 6, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 5, 2024FIMPFINAL DISPOSITION PROCESSED—
Mar 5, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 5, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 5, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 19, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 19, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 17, 2023GPNXNOTIFICATION PROCESSED BY IB—
Aug 30, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 30, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 30, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 11, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 8, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Aug 8, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 8, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 8, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 6, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jul 28, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Jul 28, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 28, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 28, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 19, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 19, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jul 12, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 11, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 11, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 11, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jan 11, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 11, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 15, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 14, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 14, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 7, 2022CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Nov 7, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 7, 2022ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Nov 7, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 7, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 7, 2022COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jul 13, 2022RFNTREFUSAL PROCESSED BY IB—
Jun 21, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 21, 2022RFRRREFUSAL PROCESSED BY MPU—
May 28, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 27, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 24, 2022DOCKASSIGNED TO EXAMINER—
Feb 22, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 18, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 17, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance