USPTO serial 79334729
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
SARA M. DORCHAK
SARA M. DORCHAK COLLARD & ROE, P.C.1077 NORTHERN BOULEVARDROSLYN, NY 11576UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Installations and devices, waste material conveying machines for processing and removal, including being treatment and recycling systems for manure and slurry; pumps and valves for transporting solid and liquid animal excreta being components of manure handling mechanical installations and machines for livestock farming; presses for separating undigested solid components being components of manure handling mechanical installations and machines for livestock farming; agricultural machines, namely, barn cleaners; stable manure valves being parts of machines; automatic conveyors being machines for manure removal and stable cleaning; manure removal and stable cleaning machines having flush systems; decomposition and manure removal industrial robots; automatic machines for producing bedding material for stables; agricultural machines, namely, excrement scrapers; agricultural machines, namely, decomposition scrapers; agricultural machines, namely, chain hoist manure removal installations for animal pens; agricultural machines, namely, rope hoist manure removal installations for animal pens; manure removal systems comprising manure handling machines for livestock tie stalls; hydraulic manure removal installations comprising manure handling machines for animal pens; hydraulic transverse-channel manure removal systems comprising manure handling machines; transverse-channel manure removal systems comprising manure handling machines with a chain hoist; transverse-channel manure removal systems comprising manure handling machines with a rope hoist; electrical pumps; hydraulic piston pumps; tractor-driven pumps being electric pumps, relating to farming; structural parts of machines for filling tankers, namely, filling pipes; electric agitators with floating pontoons being components of agricultural machines for livestock farming; lagoon agitators being structural components of agricultural machines for livestock farming; power take-off agitators being structural components of agricultural machines for livestock farming; agricultural apparatus and machines, namely, machines for slurry production; slurry machines for slurry collection and distribution; trailer-mounted slurry machines for slurry collection and distribution; sieve separators being waste separator machines; rolling industrial machine presses; liquid drainers being agricultural machines for treating slurry | ACTIVE | — |
| 009 | Fixed-line remote controls and wireless remote controls for tractor-driven pumps; electrical controllers and remote controls for installations and devices for processing and removal systems, namely, treatment and recycling for manure and slurry, pumps and valves for transporting solid and liquid animal excreta being components of installations and machines for livestock farming, presses for separating undigested solid components being components of installations and machines for livestock farming, barn cleaner machines, stable manure valves, automatic conveyors for manure removal and stable cleaning, manure removal and stable cleaning machines having flush systems, decomposition and manure removal robots, automatic machines for producing bedding material for stables, excrement scrapers, decomposition scrapers, chain hoist manure removal installations for animal pens, rope hoist manure removal installations for animal pens, manure removal systems for livestock tie stalls, hydraulic manure removal installations for animal pens, hydraulic transverse-channel manure removal systems, transverse-channel manure removal systems with a chain hoist, transverse-channel manure removal systems with a rope hoist, electrical pumps, hydraulic piston pumps, tractor-driven pumps, relating to the following fields, farming, parts of machines for filling tankers, namely, filling pipes, electric agitators with floating pontoons being components of installations and machines for livestock farming, lagoon agitators being components of installations and machines for livestock farming, power take-off agitators being components of installations and machines for livestock farming, agricultural apparatus and machines for slurry production, slurry machines for slurry collection and distribution, trailer-mounted slurry machines for slurry collection and distribution, sieve separators, rolling presses and liquid drainers for treating slurry; downloadable and recorded computer and mobile application software for operating and monitoring installations and devices for processing and removal systems, including being treatment and recycling systems for manure and slurry, pumps and valves for transporting solid and liquid animal excreta being components of installations and machines for livestock farming, presses for separating undigested solid components being components of installations and machines for livestock farming, barn cleaner machines, stable manure valves, automatic conveyors for manure removal and stable cleaning, manure removal and stable cleaning machines having flush systems, decomposition and manure removal robots, automatic machines for producing bedding material for stables, excrement scrapers, decomposition scrapers, chain hoist manure removal installations for animal pens, rope hoist manure removal installations for animal pens, manure removal systems for livestock tie stalls, hydraulic manure removal installations for animal pens, hydraulic transverse-channel manure removal systems, transverse-channel manure removal systems with a chain hoist, transverse-channel manure removal systems with a rope hoist, electrical pumps, hydraulic piston pumps, tractor-driven pumps, relating to the following fields, farming, parts of machines for filling tankers, namely, filling pipes, electric agitators with floating pontoons being components of installations and machines for livestock farming, lagoon agitators being components of installations and machines for livestock farming, power take-off agitators being components of installations and machines for livestock farming, agricultural apparatus and machines for slurry production, slurry machines for slurry collection and distribution, trailer-mounted slurry machines for slurry collection and distribution, sieve separators, rolling presses and liquid drainers for treating slurry | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 7, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 19, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 19, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 28, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 28, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 28, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 25, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 10, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 10, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 4, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 4, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 21, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 9, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 9, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 9, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 8, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 6, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 6, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 6, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 28, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 8, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 8, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 4, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 3, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 27, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 11, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 7, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 3, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |