USPTO serial 79335546
Reviewed by CopyMark Law Group
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Computer platform in the nature of recorded or downloadable software, software for processing, tracking, reporting and viewing data in the field of construction; data processing apparatus, data processing equipment; none of the aforesaid goods in connection with the fields of insurance, medical care and health and all these goods to the exclusion of goods in connection with load-bearing elements | ACTIVE | — |
| 035 | Business management and organization consultancy; commercial business and administration; business consultancy, information or inquiries; commercial consultancy services for companies relating to provision of a quality management system; business operation assistance for industrial or commercial companies; company auditing (commercial analysis); tracking and monitoring of energy consumption for others for auditing purposes; management of computer databases and computer files; consultancy regarding commercial analysis; economic studies for commercial and economic purposes; consultancy services regarding commercial project management; consulting services regarding commercial project management in the framework of construction projects; statistical information compilation services; administrative, commercial and strategic assistance, advice and information for companies; none of the aforesaid services being related to the fields of insurance, medical care and health | ACTIVE | — |
| 037 | Construction services; information and advice relating to construction; building construction supervision; consulting services regarding construction project management [construction works]; all these services excluding services related to thermal and acoustic insulation for load-bearing elements in the building sector | ACTIVE | — |
| 038 | Telecommunications, communications by computer terminals; transmission and exchange of data, information and images by electronic, computer means and via the Internet; electronic information dissemination services; providing connections to a computer server; transmission and dissemination of information held in data and image banks including by digital means; provision of access to computer, electronic and online databases; electronic transmission of data, messages and information; secure transmission of data, particularly with access codes; none of the aforesaid services being related to the fields of insurance, medical care and health | ACTIVE | — |
| 042 | Engineering services, particularly provision of technical inspection services with a view to improving security and quality in all fields of economic activity; assessments, estimates and research in scientific and technological fields provided by engineers; technical project studies; testing for the certification of quality or standards; quality control with a view to certification; quality testing of products for certification purposes; testing, analysis and evaluation of third-party goods and services for certification purposes; certification services with respect to energy efficiency of buildings; quality audits; quality checking; quality control; quality assessment; auditing relating to energy; building quality control; quality control regarding manufactured goods; quality control of computer systems, quality control of industrial machines; advisory services relating to quality assurance; advisory services relating to quality control; technical project studies; design and development of computers and software; consulting services regarding engineering project management; consulting services regarding architectural project management; none of the aforesaid services related to the fields of insurance, medical care and health and all these services to the exclusion of services related to thermal and acoustic insulation for load-bearing elements in the building sector | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 23, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 4, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 2, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 3, 2023 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Aug 16, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 16, 2023 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jun 1, 2023 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jun 1, 2023 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jun 1, 2023 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Mar 27, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 18, 2023 | ATRV | ATTORNEY REVIEW COMPLETED | — |
| Dec 5, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 21, 2022 | LIME | LIMITATION FROM THE IB - REQUEST EXAM REVIEW | — |
| Nov 16, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 16, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 7, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 6, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 26, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 25, 2022 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Mar 15, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 11, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 10, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |