Drawing for BATTERYONE

USPTO serial 79338778

BATTERYONE

Reviewed by CopyMark Law Group

Reg. 7191442Status 700Registered
Filing date
Status date
Registration date
Oct 17, 2023
Examiner
PERITZ, SARAH L
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with BATTERYONE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Timothy E. Newholm

Timothy E. Newholm Boyle Fredrickson, S.C.840 N. Plankinton Ave.Milwaukee, WI 53203UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Machines for the building industry and for the building material industry, namely, skid-steer loaders, articulated front end wheel loaders, all-wheel-steered front end loaders, telescopic front end wheel loaders, telescopic handlers, compact hydraulic excavators, mobile hydraulic excavators, crawler hydraulic excavators, and parts therefor, namely, buckets, blades, mechanical front shovels, lifting forks, electric brooms, grippers in the nature of grapples, attachment earth compactors, attachment breakers, mechanical spreaders, soil augers in the nature of earth augers, planers, adapter plates, and elevating work platforms; electrically operated machines for the building industry and for the building material industry, namely, skid-steer loaders, articulated front end wheel loaders, all-wheel-steered front end loaders, telescopic front end wheel loaders, telescopic handlers, compact hydraulic excavators, mobile hydraulic excavators, crawler hydraulic excavators, and parts therefor, namely, buckets, blades, mechanical front shovels, lifting forks, electric brooms, grippers in the nature of grapples, attachment earth compactors, attachment breakers, mechanical spreaders, soil augers in the nature of earth augers, planers, adapter plates, and elevating work platforms; hand held power tools, namely, hammers, drills, and saws; vibrating machines for soil, gravel and asphalt compaction, namely, vibratory rammers, vibratory compacting plates, vibratory compaction rollers; mechanical vibration apparatus for concrete compaction, namely, concrete internal vibrators, external concrete vibrators for shuttering and molds, and motorized vibration wet screeds; machine-operated hammers, namely, electric hammers, power hammers, and jack hammers; drilling machines; power-operated tools, namely, drilling hammers; rammers being machines; machines for soil and asphalt compaction, namely road rollers and disc machines; electrical clarified water and wastewater pump machines for dewatering and draining pits and trenches; electrical separating and joint cutting apparatus in the nature of machines, namely asphalt and concrete cutting apparatus in the nature of machines; mechanical concrete smoothers, in particular power operated concrete trowels and levelling-off devices, namely, power operated screeds; power-generating units, namely, gas operated power generators; rebar cutting apparatus, namely, rebar cutting machines; rebar bending apparatus, namely, rebar bending machines; telescopic wheel loaders for use in the building industry, wheel loader, skid steer loaders, and earth moving machines, namely, excavators; power saws; grinding machines for use in metalwork; wire-binding apparatus; wire-binding apparatus for armouring irons in the nature of rebar tying machines; stair lifts; power-operated moving and handling equipment, namely, fork lifts, crawler-tracked loaders, and telehandlers; power-operated lifting and hoisting equipment, namely, fork lifts and telehandlers; road sweeping machines; attrition machines for cleaning in the nature of street cleaning machines; vacuum cleaners; electric high pressure steam cleaners; power-operated gardening machines, namely, garden tilling machines, leaf blowers, lawn trimmers, and lawn edgers; electric lawnmowers; riding lawn mowers; electric chaff-cutters networkACTIVE—
009Devices for storing electricity, namely, electric accumulators and batteries; accumulators, electric; batteries; electric apparatus in the nature of electrical storage batteries; portable power in the nature of rechargeable batteries; carrying cases adapted for storage of batteries; chargers for electric batteries; battery testers; electric voltage transformers; electronic apparatus and electronic switches for monitoring, regulating and protecting accumulators; machine readable blank magnetic data carriers; prerecorded magnetic machine-readable data carriers featuring data processing programs for operation of electrically operated work machines, tool apparatus and building apparatus; data processing apparatus; downloadable computer data processing programs; data processing equipment and downloadable computer data processing programs for control; data processing apparatus and downloadable computer data processing programs for operation of electrically operated work machines, tool apparatus and building apparatus; illuminated advertising signs; luminous advertising signboards; mechanical advertising signboards; mechanical and luminous advertising display apparatus, namely, electronic display boards; chargers for electric accumulators and batteriesACTIVE—
011LED building site lighting systems, namely, LED modules, power supplies, and wiring; electric lamps; hand-held lights, namely, flashlights; building site light, namely, mobile light towers; heating apparatus for building sitesACTIVE—
012Dump trucks; electrically operated dump trucks; hand driven, electrically operated dump trucks; tractors; bicycles; tricycles not being toys; two-wheeled trolleys; electrically operated wheelchairs; electrically operated vehicles for transporting loads; mine cars; forklift trucks; wheelbarrowsACTIVE—
020Inflatable publicity objects; inflatable publicity balloons; tool chests, not of metal, emptyACTIVE—
028Machines for physical exercises, namely, stair-stepping machines, treadmill, rowing machine, stationary exercise bicycle, elliptical exercise machines, manually-operated exercise equipment; non-medical apparatus for achieving physical fitness, namely, vibrating apparatus used in fitness and exercise programs to stimulate muscles and increase strength and physical performanceACTIVE—
037Rental of tools, construction machinery, and equipment for construction, demolition, and cleaning; recharging of batteries and accumulators; replacement of batteries and accumulators; remanufacturing of batteries and accumulators to the order and/or specification of others; repairing of batteries and accumulatorsACTIVE—
040Rental of batteries and accumulators; disposal of batteries and accumulators, namely, destruction of products in the nature of batteries and accumulatorsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 3, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 5, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 18, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 18, 2024FIMPFINAL DISPOSITION PROCESSED—
Jan 17, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 17, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Oct 17, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 16, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 27, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 27, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 14, 2023GPNXNOTIFICATION PROCESSED BY IB—
Aug 1, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 1, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 26, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 26, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 12, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 29, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 29, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Jun 29, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 29, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 29, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 28, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Jun 28, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 28, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 28, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
May 30, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 30, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 30, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 22, 2022RFNTREFUSAL PROCESSED BY IB—
Nov 29, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 29, 2022RFRRREFUSAL PROCESSED BY MPU—
Sep 20, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 19, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 15, 2022DOCKASSIGNED TO EXAMINER—
Apr 26, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 22, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 21, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance