Drawing for IHC

USPTO serial 79339739

IHC

Reviewed by CopyMark Law Group

Reg. 7117327Status 700Registered
Filing date
Status date
Registration date
Jul 25, 2023
Examiner
MORRIS, KRISTINA KLOIBER
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with IHC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Roberto Ledesma

Roberto Ledesma Law Office of Roberto LedesmaP.O. Box 230692New York, NY 10023UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Naval and offshore dredging, mining and drilling machines; machine tools for naval, dredging works, mining works, offshore drilling works, wet soil treatment works and wet soil movement, namely, jigs, being gravity separators; pile driving and drilling machines; hydraulic hammers; hydraulic rock breakers; machine parts, namely pile sleeves; remotely operated machines for underwater mining and dredging; dredging, mining and drilling machines for the naval, dredging mining and offshore industry; lifting machines for vertical transport, being parts of naval and offshore dredging, mining and drilling machines; lift systems for naval, dredging, mining and offshore operations, namely, lifting machines for lifting of risers and remotely operated lifting machines; dredging machine parts, namely, dredging wheels being parts of bucket-wheel dredgers; swell compensators being machine parts; winches; gearboxes, other than for land vehicles; suction pipes being machine parts; bow couplings and barge load pipes being machine parts; spud carriers being machine parts; gantries being cranes; spud tilting and lifting machines; submarine ploughs; trenchers being machines for digging trenches; pile clamps for pile handling equipment being machine parts; pipe carousels and pipe lifting frames being machine parts; hydraulic cylinders and hydraulic valves being machine parts; hydraulic manifolds being parts of machines or being pipings as part of hydraulic machines; pumps, namely booster pump stations, being machines, centrifugal pumps being machines and dredge pumps; dredge valves as machine components; loading boxes being parts of loading machines; machine parts, namely dredging buckets; overflow pipes being parts of machines; grabs being machine parts; baskets being parts of industrial carousel machinery; level winders being parts of industrial carousel machinery; level wind compensators being parts of industrial carousel machinery; aligner chutes being parts of industrial carousel machinery; running trays being parts of industrial carousel machinery; sieves being parts of soil treatment machines; feed boxes being parts of soil treatment machines; hydro cyclones being parts of soil treatment machines; teeth for cutting soil or rock being parts of machines; adapters for teeth and suction mouth, all being parts of machines; turning glands being parts of machines; soil conveyors being machines; seabed leveling equipment being machines for leveling seabeds; cutter heads being parts of machines; hydraulic power generators being machines; dredging machine parts, namely, drag heads for trailing suction hopper dredgers; piling machines, namely pile drivers incorporating pile sleeves, sleeve inserts, pile cap, winches, monitoring equipment, noise reduction equipment and control cabins; sealings for propeller shafts being parts of machines; sealings for propeller shaft sleeves being parts of machines; propeller shaft bearings being parts of machines; sealing joints being parts of machines; housings for pumps for machines; impellers for use in dredge pumps; active heave compensatorsACTIVE—
012Naval, dredging, mining and offshore vessels, either with and without its own propulsion namely cutter suction dredgers, bucket wheel dredgers, plain suction dredgers, bucket ladder dredgers, grab dredgers, barge unloading dredgers, trailing suction hopper dredgers, amphibian vessels, backhoe dredgers, deep sea dredging and mining vessels as well as, dredge material delivery vessels; split barges and spray pontoons all being parts of vessels; tow boats; dredging support vessels, namely workboats; vessels used for off-shore activities either with and without their own propulsion, namely drilling ships, offshore supply vessels, well intervention and enhancement vessels, cable lay vessels, jack-up vessels with lifting platforms, crane vessels, support barges, heavy lift vessels; special vessels, namely ferries and inland cruise vessels as well as naval auxiliary vessels; submarinesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 19, 2025RHRDRESTRICTION OF HOLDER'S RIGHT OF DISPOSAL RECEIVED—
Feb 21, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Dec 30, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 21, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 26, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 26, 2023FIMPFINAL DISPOSITION PROCESSED—
Oct 25, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 11, 2023LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jul 25, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 25, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 28, 2023RHRDRESTRICTION OF HOLDER'S RIGHT OF DISPOSAL RECEIVED—
May 17, 2023GPNXNOTIFICATION PROCESSED BY IB—
May 9, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 9, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 19, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 19, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 19, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 4, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 4, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Apr 4, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 4, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 4, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 18, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 17, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 17, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 15, 2022RFNTREFUSAL PROCESSED BY IB—
Oct 21, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 21, 2022RFRRREFUSAL PROCESSED BY MPU—
Aug 30, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 29, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 19, 2022DOCKASSIGNED TO EXAMINER—
May 24, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
May 19, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 16, 2022LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
May 5, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—