USPTO serial 79339785
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeffrey M. Becker
Jeffrey M. Becker Haynes and Boone, LLP2323 Victory Avenue, Suite 700Dallas, TX 75219UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Constructions services, namely, building construction; construction of public works and rural works, namely, offshore constructions, pipeline construction, concrete pouring and forming for building and other commercial or public concrete structures, construction of underground utilities and housing pads, construction of oil and gas, petrochemical and energy refineries and plants; construction work supervision being construction management; information with respect to construction; Construction, maintenance and repair of industrial installations, offshore energy transition (carbon capture and sequestration, offshore wind turbine, solar panel) | ACTIVE | — |
| 041 | Training services for industrial plants, namely, providing specialized professional training to employees in the fields of in process operations, factory maintenance, analytical control of process and product flows, environmental protection and safety, project management and factory construction, customized training solutions integrating an interface design and advanced learning methods, dynamic simulation of operator training (OTS), coordinating the procurement and improvement of process control skills and solving operator problems | ACTIVE | — |
| 042 | Industrial plant design services, namely, conceptual process studies, consolidation of process assemblies, basic studies required to support a set of technical design all containing the data necessary to a competent contractor for carrying out detailed engineering in the nature of engineering design services; detailed engineering services for industrial plants, namely, online non-downloadable software for purchasing material, developing diagrams for pipework and instruments published for the construction, developing detailed pipework drawings, including measuring and stress calculations, drafting detailed drawings relating to instrumentation, to electrical installations and to civil engineering works, managing supplier designs, controlling costs and bill books, start-up procedures, developing diagrams for pipework and process instruments and public services published for the detailed engineering, drafting detailed maps of hazardous areas and plots, drafting the main diagrams for pipework, instrumentation, electricity and civil engineering; maintenance engineering services for industrial plants; converting existing printed courses to digital media formats, namely, conversion of data or documents from physical to electronic media; commissioning of industrial plants, namely, online non-downloadable software for construction management, 3D construction systems, subdivision of the system via the 3D model enabling 3D viewing of the systems and improving pre-commissioning and commissioning studies during the engineering phase, tracking the progress of construction/pre-commissioning/commissioning up to delivery, QA/QC statistics and reports, interface management between different phases of the project lifecycle (engineering, construction, pre-commissioning, commissioning); industrial design; architecture, namely, architectural services; research and development of industrial systems and equipment; technical research in the fields of engineering, design, construction, project management and processing technologies | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 4, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 8, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 8, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 7, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 12, 2023 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Nov 7, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Nov 7, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 3, 2023 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Oct 29, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 11, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 11, 2023 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Aug 22, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 22, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 21, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 2, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 2, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 2, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 2, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 2, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 2, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 18, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 4, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 4, 2023 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| May 4, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 4, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 29, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 29, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 29, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 26, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 1, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 1, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 29, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 28, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 10, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 6, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| May 6, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 5, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |