Drawing for T.EN TECHNIP ENERGIES

USPTO serial 79339785

T.EN TECHNIP ENERGIES

Reviewed by CopyMark Law Group

Reg. 7209443Status 700Registered
Filing date
Status date
Registration date
Nov 7, 2023
Examiner
KUHN, RIO NICE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with T.EN TECHNIP ENERGIES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey M. Becker

Jeffrey M. Becker Haynes and Boone, LLP2323 Victory Avenue, Suite 700Dallas, TX 75219UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Constructions services, namely, building construction; construction of public works and rural works, namely, offshore constructions, pipeline construction, concrete pouring and forming for building and other commercial or public concrete structures, construction of underground utilities and housing pads, construction of oil and gas, petrochemical and energy refineries and plants; construction work supervision being construction management; information with respect to construction; Construction, maintenance and repair of industrial installations, offshore energy transition (carbon capture and sequestration, offshore wind turbine, solar panel)ACTIVE—
041Training services for industrial plants, namely, providing specialized professional training to employees in the fields of in process operations, factory maintenance, analytical control of process and product flows, environmental protection and safety, project management and factory construction, customized training solutions integrating an interface design and advanced learning methods, dynamic simulation of operator training (OTS), coordinating the procurement and improvement of process control skills and solving operator problemsACTIVE—
042Industrial plant design services, namely, conceptual process studies, consolidation of process assemblies, basic studies required to support a set of technical design all containing the data necessary to a competent contractor for carrying out detailed engineering in the nature of engineering design services; detailed engineering services for industrial plants, namely, online non-downloadable software for purchasing material, developing diagrams for pipework and instruments published for the construction, developing detailed pipework drawings, including measuring and stress calculations, drafting detailed drawings relating to instrumentation, to electrical installations and to civil engineering works, managing supplier designs, controlling costs and bill books, start-up procedures, developing diagrams for pipework and process instruments and public services published for the detailed engineering, drafting detailed maps of hazardous areas and plots, drafting the main diagrams for pipework, instrumentation, electricity and civil engineering; maintenance engineering services for industrial plants; converting existing printed courses to digital media formats, namely, conversion of data or documents from physical to electronic media; commissioning of industrial plants, namely, online non-downloadable software for construction management, 3D construction systems, subdivision of the system via the 3D model enabling 3D viewing of the systems and improving pre-commissioning and commissioning studies during the engineering phase, tracking the progress of construction/pre-commissioning/commissioning up to delivery, QA/QC statistics and reports, interface management between different phases of the project lifecycle (engineering, construction, pre-commissioning, commissioning); industrial design; architecture, namely, architectural services; research and development of industrial systems and equipment; technical research in the fields of engineering, design, construction, project management and processing technologiesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 4, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 8, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 8, 2024FIMPFINAL DISPOSITION PROCESSED—
Feb 7, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 12, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 7, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Nov 7, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 3, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Oct 29, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 11, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 11, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 22, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 22, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 21, 2023GPNXNOTIFICATION PROCESSED BY IB—
Aug 2, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 2, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 2, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 2, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 2, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 2, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 18, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 4, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 4, 2023EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
May 4, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 4, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 29, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 29, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 29, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 26, 2022RFNTREFUSAL PROCESSED BY IB—
Jul 1, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 1, 2022RFRRREFUSAL PROCESSED BY MPU—
Jun 29, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 28, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 10, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
May 6, 2022DOCKASSIGNED TO EXAMINER—
May 6, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 5, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance