USPTO serial 79340778
Reviewed by CopyMark Law Group
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Fabricio Vayra
Fabricio Vayra Perkins Coie LLPP.O. Box 2608Seattle, WA 98111UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Software for embedded systems; software for running directly on a computer system [firmware]; low-level software; system software; bootloader software; operating systems; computer device drivers; software for network processors; software for network devices (elements) [switches, routers, network controllers]; software for telecommunications network protocols; data-plane software; software for data security functions; software for network security functions; software for cryptography functions; software for cloud computing infrastructure; software for data centre infrastructure; software for space research; computer software for the processing and analysis of data; large-scale integration integrated circuits [chips]; electronic logic circuits being inserts for reprogrammable FPGA integrated circuits; printed circuit boards for integrated circuits; data processing apparatus; network appliances; telecommunication apparatus; data security control apparatus; network security devices; data storage devices | ACTIVE | — |
| 038 | Telecommunication services | ACTIVE | — |
| 042 | Design, deployment, the maintenance, upgrading, maintenance of software for embedded systems; design, deployment, the maintenance, upgrading, maintenance of software for running directly on a computer system [firmware]; design, deployment, the maintenance, upgrading, maintenance of low-level software, system software [device drivers, operating systems, bootloader software]; design, deployment, the maintenance, upgrading, maintenance of software for network processors and network devices (elements) based thereon [switches, routers, network controllers]; design, deployment, the maintenance, upgrading, maintenance of software for telecommunications network protocols; design, deployment, the maintenance, upgrading, maintenance of software for data security functions, network security functions and cryptographic algorithms; design, deployment, the maintenance, upgrading, maintenance of software being cloud computing infrastructure and data centre infrastructure; design, development of large scale-integration integrated circuits [chips]; design, development of electronic logic circuits being inserts for reprogrammable FPGA integrated circuits; design, deployment, testing of printed electronic circuits (boards) for integrated circuits; design, deployment, testing of electronic data processing devices, electronic network devices and electronic telecommunications devices; design, deployment, testing of electronic data security and network security devices; design, deployment, testing of electronic data storage devices; design, creation, installation, maintaining, upgrading, deployment, maintenance and servicing of software, in particular in the fields of cloud computing, data centres, telecommunications network infrastructure, data storage, data and network security, data processing and analysis, and space research; scientific research and development relating to software and integrated circuits (reconfigurable), in particular in the following fields, cloud computing, data centres, telecommunications network infrastructure, data storage, data processing and analysis, and space research | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 3, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 4, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 11, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 6, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 12, 2023 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Oct 25, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 25, 2023 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Aug 4, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 5, 2023 | MAB2 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jul 5, 2023 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jul 5, 2023 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jun 12, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 12, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 12, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 14, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Apr 14, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 14, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 14, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 14, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jan 15, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 8, 2023 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Dec 16, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 16, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 4, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 3, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 23, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| May 24, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 20, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 19, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |