Drawing for ROOFIT.SOLAR

USPTO serial 79341763

ROOFIT.SOLAR

Reviewed by CopyMark Law Group

Reg. 7403926Status 700Registered
Filing date
Status date
Registration date
Jun 4, 2024
Examiner
VAGHANI, MAYUR C
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ROOFIT.SOLAR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Marius J Jason

4955 Shankland RdWilloughby, OH 44094-5636UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006metal materials for building and construction, namely building panels of metal, metal roofing, Metal roof flashing, Metal roof trusses; transportable buildings of metal; non-electric cables and wires of common metal; metal containers for storage or transport of building materials, roofing, solar cells; Metal materials for building and construction containing solar panels, namely building panels of metal and metal roofing incorporating solar cells; Roofing of metal, incorporating solar cells; Metal structures for mounting solar panels; Substrates primarily of metal for supporting solar cells, photovoltaic cells and solar collectorsACTIVE—
009measuring apparatus and instruments, namely clamp meters for measuring electricity, electricity meters; apparatus and instruments for conducting, namely, electric conductors, switching, namely, electric switches and power switches, transforming, namely, transformers and current transformers, accumulating, namely, accumulators and batteries, regulating, namely, voltage regulators, or controlling electricity, namely, electric current control devices; Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; Electrical power distribution units; Electrical distribution systems, namely, power distribution panels; Solar cells; Solar batteries; Solar panels for production of electricity; photovoltaic solar modules for production of electricity; Solar panels for electricity generation; photovoltaic inverters; Photovoltaic apparatus and installations in the nature of solar panels, photovoltaic cells for generating solar electricity; Photovoltaic apparatus for converting solar radiation to electrical energy, namely photovoltaic thermal module, photovoltaic cladding panels, photovoltaic roofing members, photovoltaic solar modules, photovoltaic thermal hybrid module, photovoltaic solar hybrid modules; Solar wafers; Photovoltaic installation apparatus, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; Home and office automation systems comprised of computer hardware, wireless and wired controllers, and downloadable software for automating electrical power production, storage and usage; Downloadable computer software for monitoring and controlling electric energy production, storage and usage; Downloadable computer software for energy management; electricity measuring instruments, namely voltmeters, clamp meters for measuring electricity; electric control apparatus, namely electronic controllers for use with solar panels; energy control devices, namely electric control devices for energy management; electric control apparatus for the supply and consumption of electricity, namely electronic controllers for use with power converters; apparatus for monitoring electrical energy consumption, namely energy meters for tracking and monitoring energy usage; electric control devices for energy managementACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 7, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 14, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 14, 2024FIMPFINAL DISPOSITION PROCESSED—
Sep 4, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 4, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 4, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 19, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 19, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 18, 2024GPNXNOTIFICATION PROCESSED BY IB—
Feb 28, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 28, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 28, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 28, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 9, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 7, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 7, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 7, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Nov 27, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 8, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 8, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 11, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 11, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 11, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 11, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 11, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 11, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 3, 2023RFNTREFUSAL PROCESSED BY IB—
Jan 11, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 11, 2023RFRRREFUSAL PROCESSED BY MPU—
Oct 28, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 27, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 24, 2022DOCKASSIGNED TO EXAMINER—
Jun 14, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 10, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 9, 2022LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Jun 2, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance