USPTO serial 79342166
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Andrea S. Fuelleman
Andrea S. Fuelleman Neal, Gerber & Eisenberg LLP225 West Randolph StreetSuite 2800Chicago, IL 60606| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Installations for lifting, moving and installing cable vehicles on self-propelled land vehicles, namely, power operated lifting machines; lifting installations for the transport of persons and goods; tube conveyors, hydraulic; pneumatic tube conveyors; belt conveyors; conveyors being machines; robotic mechanisms for conveying namely industrial robots being robotic machines for conveying and loading-unloading; mobile vehicle lifting apparatus in the nature of power-operated lifts for moving, parking and storing land vehicles; vehicle lifts in the nature of power-operated lifts for moving, parking and storing land vehicles; power-operated lifts for moving, parking and storing land vehicles; lifts for use with vehicles in the nature of power-operated lifts for moving, parking and storing land vehicles; loading machines in the nature of loading platforms for vehicles; elevators, namely, inclined elevators | ACTIVE | — |
| 009 | Downloadable computer software for the control and command of installations for lifting, moving and installing cable vehicles on self-propelled land vehicles; electro-dynamic remote control apparatus for the remote control of installations for lifting, moving and installing cable vehicles on self-propelled land vehicles; downloadable vehicle control computer software, namely downloadable computer software for controlling the position of cable vehicles held on self-propelled land vehicles; none of the foregoing includes adapters or computer software for wirelessly connecting to vehicle steering wheels or steering wheel control interface | ACTIVE | — |
| 012 | Cable transport apparatus and installations, namely, cable cars and cables for lifts; cars for cable transport installations; railway bogies for transporting trailers by rail; transport bogies, namely, bogies for railway cars; aerial cable transport cars for the transportation of people on cableways; transport trailers for transporting land vehicles; funicular cabs; funiculars, namely, funicular railcars; rolling stock for funicular railways; suspension arms for cable cars; trolleys rail vehicles, namely trains; unmanned conveying vehicles, namely, aerial cable cars; ropeways being aerial tramways; gondola lifts, cable cars, trams; ground ropeway in the nature of cable cars, funiculars, namely, funicular railcars; private and public rail transportation systems, namely, elevated tramways, automatic tramways; railway rolling stock, parts and fittings of the aforesaid goods non included in other classes | ACTIVE | — |
| 037 | Maintenance, servicing, and repair of aerial ropeway machines, vehicles, and equipment, used for lifting, moving and installing cable vehicles on self-propelled land vehicles; construction of road, cable and rail transport networks comprised of cable cars, elevated tramways, automatic tramways, gondola lifts, funicular railcars, gondola cable car lifts, aerial cableway cars, cable railway cars, and cableway cars; construction, maintenance and repair of overhead cableway installations, overland cableway installations and rail transport installations comprised of cable cars, elevated tramways, automatic tramways, gondola lifts, railway cars, funicular railcars, gondola cable car lifts, aerial cableway cars, cable railway cars, cableway cars, and rail transport vehicle installations; construction consultancy relating to aerial cableway installations and overland cableway installations comprised of cable cars, elevated tramways, automatic tramways, gondola lifts, railway cars, funicular railcars, gondola cable car lifts, aerial cableway cars, cable railway cars, cableway cars, and rail transport vehicle installations and for rail transport vehicles; building construction of cubicles; assembly being installation of accessories for vehicles; installation of parts for vehicles; maintenance, servicing and repair of vehicles | ACTIVE | — |
| 039 | Intermodal transport of passengers by cable vehicles combined with land vehicles; cable car transport; transport of passengers by funicular railway; arranging, operating and providing transport by cable transport systems; consultancy services for intermodal private and public transportation by cable vehicles combined with land vehicles; consultancy services for private and public transportation by cable-cars, ropeway, ski lifts, chair lifts, gondola lifts, tramways, ground ropeway, funiculars; none of the foregoing includes services in the field of clinical travel | ACTIVE | — |
| 042 | Design of apparatus and installations for intermodal transport by rope vehicles, namely, cable cars, elevated tramways, automatic tramways, gondola lifts, railway cars, funicular railcars, gondola cable car lifts, aerial cableway cars, cable railway cars, cableway cars combined with land vehicles | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 4, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 4, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 4, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 28, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 2, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 16, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 16, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 3, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 2, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Apr 2, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 16, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 16, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 13, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 27, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 27, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 27, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 12, 2023 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Dec 3, 2023 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Nov 26, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 15, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 15, 2023 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Oct 28, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 27, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 27, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 16, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 16, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 16, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 6, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 6, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 6, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 5, 2023 | RFNP | REFUSAL PROCESSED BY IB | — |
| Dec 10, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 9, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 29, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 28, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 21, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 14, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 10, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 9, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |