USPTO serial 79342769
Reviewed by CopyMark Law Group
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Data processing hardware; programmable controllers; electronic control units; electronic control systems; iot gateway [network devices for connecting devices or systems to the internet of things]; iot sensors; electronic sensors; computer hardware modules for use with the internet of things [iot]; wireless modules, namely, integrated circuits specifically designed for the internet of things [iot]; computer software; industrial process control software; sensor software; electrical engineering software; control segment integration software; operating systems; operating system software for computers | ACTIVE | — |
| 042 | Scientific and technological services and research and design services relating thereto; industrial analysis and research services; design and development of computer hardware and software; development of software for sensors and control of industrial and laboratory processes; consultancy for information technology, in particular in the field of the internet of things [iot], industry 4.0, laboratory digitalization and embedded networking; integration of computer systems, computer systems, computer networks in internet of things [iot] environments; design and development of products based on communication technologies, namely, development and design of products and projects related to the internet of things [iot]; consultancy services concerning the planning of laboratory premises; design and development of computer software for process control of laboratory equipment; design services concerning the development of networks | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 12, 2024 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 24, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 24, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 11, 2023 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Nov 22, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 22, 2023 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Oct 13, 2023 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Sep 25, 2023 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Sep 23, 2023 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Sep 23, 2023 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jun 25, 2023 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Mar 29, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 3, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 3, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 11, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 10, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 28, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 21, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 17, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 16, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |