USPTO serial 79342953
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Bradley P. Heisler
Bradley P. Heisler c/o AJ ParkLevel 22, Aon Centre, 1 Willis StreetWellington, 6140NEW ZEALAND| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Building and construction materials of a predominantly metallic nature including drainage systems, plumbing apparatus, water reticulation apparatus and drainage apparatus, namely, metal drainage channels, metal grates, metal pipes, metal tubes; small items of metal hardware namely metal screws and fasteners in the nature of bolts, nails, rivets, nuts and washers | ACTIVE | — |
| 011 | Apparatus and installations for water supply namely faucets and outlets in the nature of spigots, faucets, and drains; apparatus for sanitary purposes, domestic and commercial plumbing, namely floor, wall and shower drains being shower channels, appliance drainage channels, door channels, plumbing fittings | ACTIVE | — |
| 019 | Building and construction materials of a predominantly non-metallic nature including drainage systems, plumbing apparatus, and water reticulation apparatus and drainage apparatus, namely non-metal drainage channels, non-metal sewerage and water pipes, non-metal tubes for allowing continuous water flow through plumbing systems and preventing water overflow; building materials, wallboards and wall panels having waterproof and water resistant properties in the nature of waterproof fabric used in building construction for protection against floods | ACTIVE | — |
| 037 | Building, construction, installation and repair services, namely, installation and repair of plumbing, building, construction, installation and repair of utilities in the nature of sewage and water in construction sites, advisory and consultancy services related to building, construction, installation and repair services in the field of water and sewer utilities, plumbing; all of the foregoing also available online and/or via the Internet | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 1, 2025 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Mar 18, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 22, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 22, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 21, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 21, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Nov 21, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 16, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Sep 5, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 5, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 16, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 16, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 16, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 31, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 28, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 27, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 27, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 12, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 11, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 11, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 10, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 9, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 1, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 28, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 23, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 23, 2022 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jun 17, 2022 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |