Drawing for >B< ONE

USPTO serial 79343178

>B< ONE

Reviewed by CopyMark Law Group

Reg. 7295922Status 700Registered
Filing date
Status date
Registration date
Feb 6, 2024
Examiner
LEE, RAYMOND KANGMIN
Law office
PETITIONS OFFICE

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with >B< ONE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Farzad A. Panjshiri

Farzad A. Panjshiri Cantor Colburn LLP20 Church Street22nd FloorHartford, CT 06103

Goods and services

ClassDescriptionStatusFirst use
006Fittings of metal for connecting pipes and tubes; pipes of metal; tubes of metal; manually operated metal valves; nuts of metal; metal seals for water, heating, refrigeration and plumbing pipe connection; junctions of metal for pipes; tees, bends, elbows and couplers of metal for pipes; parts, fittings and accessories for the aforesaid goods none of the aforesaid goods being made of plastic, namely, metal replacement parts, metal structural parts, metal pipe clips, metal pipe fittings, metal expansion joints for piping, metal pipe collarsACTIVE
007Power tools, namely, electrohydraulic pipe connecting machines, industrial pipe connecting machines, pipe connecting tools being part of machines; powered tools, namely, electrohydraulic pipe connecting machines; electric power tools, namely, electrohydraulic pipe connecting machines; mechanically activated tools, namely, electrohydraulic pipe connecting machines, industrial pipe connecting machines, pipe connecting tools being part of machines; mechanically operated tools, namely, electrohydraulic pipe connecting machine, industrial pipe connecting machines, pipe connecting tools being part of machines; hand-held tools, not manually driven, namely, electrohydraulic pipe connecting machine, industrial pipe connecting machines, pipe connecting tools being part of machines; crimping tools being parts of machines; machine tools for use in the field of plumbing and heating, namely, electrohydraulic pipe connecting machine, industrial pipe connecting machines, pipe connecting tools being part of machines; dies and jaws for use with machine tools; parts and fittings for all the aforesaid goods, namely, structural and replacement parts, machine tool holders; none of the aforesaid goods being screwdrivers or bits for toolsACTIVE
008Hand-operated tools, namely, copper tube cutters, hand-operated scraping tool for cleaning pipes for plumbing purposes and deburrers, clamps, hand-operated press machines for connecting pipes for the purpose of pipe formation, hand-operated crimping irons for connecting pipes used in pipe and plumbing fittings, pipe connecting jaws, deburring tools; hand tools, hand-operated, namely copper tube cutters, hand-operated scraping tool for cleaning plumbing fittings and pipes for use in plumbing, heating, refrigeration and cooling and deburrers, clamps, hand-operated clamps for connecting pipes for the purpose of pipe formation; hand tools, namely dies; parts and fittings for all the aforesaid goods, namely, structural and replacement parts, blades; none of the aforesaid goods being screwdrivers or bits for toolsACTIVE
011Thermostatic valves as parts of heating installations, gas regulator valves, valves for water purification installations, valves for water softening apparatus and installations; shower mixing valves, shower control valves; steam valves; ball valves being parts of heating or gas installations; radiator valves; connecting pieces, accessories and apparatus for water supply, air conditioning, heating, refrigeration, cooling, sanitation, ventilation, gas and water installations, namely, pipe connection fittings for connecting sections of water and gas pipes and tubes, stop ends, pipe connectors, tees, flanges, bends, and elbows for water and gas pipes all specifically designed to be used as replacement and structural parts of air conditioners, gas water heaters, hot water heaters, water heaters, immersion heaters, heating installations, fridge-freezers, and refrigerators; parts, components and fittings for all the aforesaid goods, namely, structural and replacement partsACTIVE
019Pipes and tubes, not of metal, for building; parts, fittings and accessories for the aforesaid goods, namely, non-metal pipe collars, plastic pipe supports, non-metal pipe connectors, non-metal elbows for pipes, non-metal pipe fittings for rigid pipesACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 26, 2026EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS
Feb 26, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Feb 26, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 26, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Sep 13, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED
Jun 2, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB
May 13, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB
May 13, 2024FIMPFINAL DISPOSITION PROCESSED
May 6, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Feb 6, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Feb 6, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 17, 2024CHPNPOST PUBLICATION AMENDMENT – NOT ENTERED
Jan 17, 2024APETASSIGNED TO PETITION STAFF
Dec 18, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Dec 4, 2023EPPATEAS POST PUBLICATION AMENDMENT RECEIVED
Nov 29, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Nov 29, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Nov 21, 2023GPNXNOTIFICATION PROCESSED BY IB
Nov 21, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Nov 21, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 1, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Nov 1, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Nov 1, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Oct 18, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Oct 18, 2023XAECEXAMINER'S AMENDMENT ENTERED
Oct 18, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Oct 18, 2023GNEAEXAMINERS AMENDMENT E-MAILED
Oct 18, 2023CNEAEXAMINERS AMENDMENT -WRITTEN
Oct 10, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Oct 10, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 10, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 2, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Mar 1, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 1, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 21, 2022RFNTREFUSAL PROCESSED BY IB
Nov 3, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Nov 3, 2022RFRRREFUSAL PROCESSED BY MPU
Sep 7, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 6, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 2, 2022DOCKASSIGNED TO EXAMINER
Jun 28, 2022MAFRAPPLICATION FILING RECEIPT MAILED
Jun 24, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jun 23, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance