USPTO serial 79343301
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John O'Malley
John O'Malley Volpe Koenig30 S. 17th St.Suite 1800Philadelphia, PA 19103| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current; electric accumulators; apparatus for generating photovoltaic power, namely photovoltaic solar panels, photovoltaic inverters, photovoltaic cells and modules; solar collectors for supplying electrical energy as parts of photovoltaic installations; solar panels, photovoltaic solar panels, solar panels placed on water, solar collectors for electricity generation; photovoltaic solar panels; photovoltaic solar panels for the production of electricity for roofs; photovoltaic solar power plants; floating photovoltaic power plants; photovoltaic power plants on water; apparatus and instruments for capture and transformation of solar radiation into electrical energy, namely photovoltaic solar modules, solar cells, solar panels for the production of electricity; photovoltaic solar apparatus and instruments for use on roofs and facades, namely photovoltaic solar panels, photovoltaic inverters, photovoltaic cells and module; apparatus and instruments for photovoltaic-type energy, electricity, production, namely, photovoltaic cells and modules, photovoltaic solar panels, photovoltaic inverters, photovoltaic cells and module ; photovoltaic cells | ACTIVE | — |
| 019 | Non-metal structures, namely, floating stands for mounting solar panels; non-metallic structures, namely, floating stands for mounting photovoltaic installations for electricity production; prefabricated non-metal brackets, for charging solar cells; portable buildings, not of metal; non-metal floating structures for mounting photovoltaic panels; roofing, not of metal, incorporating photovoltaic cells | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 9, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 19, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 25, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 25, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 24, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 24, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 24, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 21, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 8, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 8, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 2, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 2, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 19, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 5, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 30, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 30, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 30, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 10, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 29, 2023 | RFNP | REFUSAL PROCESSED BY IB | — |
| Mar 4, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 3, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 11, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 10, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 10, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 5, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 30, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 27, 2022 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jun 23, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |