Drawing for WORK SMARTER, DREAM BIGGER

USPTO serial 79343343

WORK SMARTER, DREAM BIGGER

Reviewed by CopyMark Law Group

Reg. 7435186Status 700Registered
Filing date
Status date
Registration date
Jul 9, 2024
Examiner
MESSICK, TABITHA LEE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with WORK SMARTER, DREAM BIGGER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Chinhwei Chen

Chinhwei Chen Jianq Chyun Intellectual Property Office7F.-1, No. 100, Roosevelt Rd. Sec. 2Taipei, 10084TAIWAN

Goods and services

ClassDescriptionStatusFirst use
007Agricultural machines and agricultural implements, other than hand-operated, namely, power tillers, power operated grass trimmers, weeding machines, fertilizer distributing machines other than hand-operated, seed drills for agricultural machines, grass collectors in the nature of lawn sweepers, mulchers, ridgers, inter-row tillage machines, reaper-binders, in the nature of binders being reaping machines, tedding machines, threshing machines, stem crushing machines, power operated cultivators, combine harvesters, soil crushing machines, plows, snow blowers, agricultural seed planting machines, power-operated chaff cutters, rakes for power-operated tillers being machine parts, rake machines, rakes for rake machines being machine parts, powered pruning machines, branch collector machines for collecting branches and leaves that have fallen to the ground after pruning; construction machines and apparatus, namely, bulldozers, graders being earth moving machines, trenchers being trench cutters, dredging machines; loading and unloading machines; non-electric prime movers, not for land vehicles, namely, engines not for land vehicles; parts of non-electric prime movers, namely, engines not for land vehicles and mufflers for motors and engines; machine elements, not for land vehicles, namely, replacements parts for the foregoing agricultural machines; lawnmowers; metalworking machines and metal working machine tools; repairing or fixing machines and apparatus, namely, machines and apparatus for repairing lawnmowers, for repairing weeding machines, for repairing power-operated grass trimmers, for repairing power tillers, and for repairing snow blowers; power-operated sprayers for disinfecting, insecticides and deodorants; starters for motors and engines; AC motors and DC motors, not for land vehicles; AC generators; DC generators; powered pruning machines and their component and replacement parts and accessories, namely, power-operated pruning shear, power-operated pruning knives, power-operated pruning saws, power-operated pruning scissors, power-operated pruning clippers; powered branch collector machines and their parts and accessories, namely, machine parts for storage for cut branches and leaves, raking machines in the nature of rakes for collecting branches and leaves, engine-powered sweepers for branches and leaves; power tillers and their parts and accessories, namely, ploughs to plow the fields, ploughs for removing grasses, ridger machines for forming ridges, machine tools used for ground leveling, harrows for ridging or cultivation; mowing machines and their parts and accessories, namely, trimmer heads for mowing, engine-powered knives for mowing, engine-powered sweepers for mowing, raking machines for cutting grass and turf, plow blades for mowing; snow blowers and their parts and accessories, namely, blades for blowing snow being machine parts, snow pushers in the nature of plows for attachment to vehicles, snow ploughs, snow throwers, snow blower pump impellers, snow plow scrapers being earth moving machines; machine parts, namely, attachments for power-operated pruning machines attached thereto to perform multiple operations in the nature of engine-powered rake attachments for collecting branch and leaves, tractor towed agricultural harvesters for collecting chestnuts, engine-powered weed cutters for cutting and shredding weeds, hay tedding attachments, mowing attachments in the nature of engine-powered mowers, and cultivating or ploughing attachments in the nature of plows; machine parts, namely, attachments for power-operated branch collectors attached thereto to perform multiple operations in the nature of engine powered rake attachments for collecting branch and leaves, tractor towed agricultural harvesters for collecting chestnuts, engine-powered weed cutters for cutting and shredding weeds, hay tedding attachments, mowing attachments in the nature of engine-powered mowers, and cultivating or ploughing attachments in the nature of plows; machine parts, namely attachments for power tillers attached thereto to perform multiple operations in the nature of engine-powered rake attachments for collecting branch and leaves, tractor towed agricultural harvesters for collecting chestnuts, engine-powered weed cutters for cutting and shredding weeds, hay tedding attachments, mowing attachments in the nature of engine-powered mowers, and cultivating or ploughing attachments in the nature of plows; machine parts, namely, attachments for mowing machines attached thereto to perform multiple operations in the nature of engine-powered rake attachments for collecting branch and leaves,tractor towed agricultural harvesters for collecting chestnuts, engine-powered weed cutters for cutting and shredding weeds, hay tedding attachments, mowing attachments in the nature of engine-powered mowers, and cultivating or ploughing attachments in the nature of plowsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 4, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 13, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 13, 2024FIMPFINAL DISPOSITION PROCESSED—
Oct 9, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 9, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 9, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 2, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 25, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 23, 2024GPNXNOTIFICATION PROCESSED BY IB—
Apr 23, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 3, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 3, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 21, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 19, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 19, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 19, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 18, 2023OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 29, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 29, 2023OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 16, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 16, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 16, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 13, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 13, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 13, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 12, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 12, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 12, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 5, 2023RFNPREFUSAL PROCESSED BY IB—
Mar 16, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 15, 2023RFRRREFUSAL PROCESSED BY MPU—
Jan 22, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 21, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 17, 2023DOCKASSIGNED TO EXAMINER—
Jun 28, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 24, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 23, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance