USPTO serial 79343448
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Michael T. Murphy
Michael T. Murphy GLOBAL IP COUNSELORS, LLP1233 20TH STREET, NW, Suite 600WASHINGTON, DC 20036UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 011 | Polymerization installations not for medical or dental purposes, namely, air cooling apparatus, cooling installations for water and air and cooling machines being cooling apparatus for water and air, distillation columns not for scientific use, drying apparatus for chemical processing and drying installations comprised of drying apparatus for chemical processing, evaporators for chemical processing, furnaces, heat exchangers, other than parts of machines, heating apparatus for water and air, heating installations, regulating accessories for water supply in the nature of metered valves, regulating and safety accessories for gas apparatus in the nature of metered valves, pressure regulators for gas pipes and lines, flashback arrectors, and reverse flow check valves, regulating and safety accessories for gas pipes in the nature of pressure regulators for gas pipes and lines, regulating and safety accessories for water apparatus being water supply in the nature of metered valves, safety accessories in the nature of metered valves for water or gas apparatus being water and gas supply and gas pipes, and ventilation installations and apparatus, namely, ventilation hoods and ventilating fans for industrial purposes | ACTIVE | — |
| 037 | Maintenance of chemical installations, particularly of polymerization installations being air cooling apparatus, cooling installations and machines, distillation columns, drying apparatus and installations, evaporators, furnaces, heat exchangers, other than parts of machines, heating apparatus, heating installations, regulating accessories for water or gas apparatus and pipes, regulating and safety accessories for gas apparatus, regulating and safety accessories for gas pipes, regulating and safety accessories for water apparatus, safety accessories for water or gas apparatus and pipes, and ventilation installations and apparatus; construction of chemical plants and polymerization installations being air cooling apparatus, cooling installations and machines, distillation columns, drying apparatus and installations, evaporators, furnaces, heat exchangers, other than parts of machines, heating apparatus, heating installations, regulating accessories for water or gas apparatus and pipes, regulating and safety accessories for gas apparatus, regulating and safety accessories for gas pipes, regulating and safety accessories for water apparatus, safety accessories for water or gas apparatus and pipes, and ventilation installations and apparatus | ACTIVE | — |
| 042 | Engineering services, particularly design of chemical plants and polymerization installations; industrial research in the field of process engineering, particularly in relation to polymerization processes | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 24, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 9, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 18, 2023 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 27, 2023 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 27, 2023 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 22, 2023 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 22, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Aug 22, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 6, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jun 6, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 6, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 17, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 17, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| May 17, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 2, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 2, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 1, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 1, 2023 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 25, 2023 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jan 25, 2023 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 25, 2023 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 12, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 10, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 10, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 11, 2022 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 22, 2022 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 22, 2022 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 16, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 15, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 10, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 28, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 24, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 23, 2022 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |