Drawing for ENKA UK ENGINEERING & CONSTRUCTION

USPTO serial 79344163

ENKA UK ENGINEERING & CONSTRUCTION

Reviewed by CopyMark Law Group

Reg. 7082724Status 700Registered
Filing date
Status date
Registration date
Jun 20, 2023
Examiner
JOHNSON, AISHA CLARKE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ENKA UK ENGINEERING & CONSTRUCTION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Utku Aydiner

Utku Aydiner Aydiner Law1 Embarcadero Center, Suite 1200San Francisco, CA 94111United States

Goods and services

ClassDescriptionStatusFirst use
037Cleaning services for buildings, public areas, industrial premises; disinfecting, vermin exterminating services, other than for agriculture, rental of cleaning machines and equipment; construction services, namely, construction of buildings, roads, bridges, dams and ports, excavation services, concrete paving, pouring, pumping and leveling services, foundation contractor services, pipe laying services, construction of steel structures, electrical contractor services, inspection services in the course of construction of buildings, roads, bridges, dams, ports, and demolition and renovation of buildings; rental of construction machines and equipment, namely, rental of earth moving equipment and excavators, loaders, dump trucks, graders, rollers, road paving machines, bulldozers, engines for building and construction machinery, cranes, drillers, telehandlers, skid-steer loaders, and aerial work platforms; vehicles service stations for land vehicles, maintenance, repair and refueling of land vehicles; vehicles service stations for marine vehicles, maintenance, repair and refueling of marine vehicles; repair and maintenance of air vehicles; upholstering, repair and restoration of furniture; repair of shoes, bags and belts; cleaning, care and repair of clothing; installation, maintenance and repair of industrial machines and equipment, office machines and equipment, communication apparatus, electric and electronic appliances; repair and maintenance of lifts; clock and watch repair; mining services, namely, mining extraction services and quarrying services; installation, maintenance and repair of heating, cooling and sanitary installationsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 12, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 12, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 12, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 13, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 26, 2023XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Sep 26, 2023XXCRGENERIC MADRID TRANSACTION CREATED—
Sep 20, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 20, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 20, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 4, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 4, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 15, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 14, 2023PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jan 27, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 25, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 24, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 24, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 13, 2022RFNPREFUSAL PROCESSED BY IB—
Nov 18, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 17, 2022RFRRREFUSAL PROCESSED BY MPU—
Nov 14, 2022ATRVATTORNEY REVIEW COMPLETED—
Nov 14, 2022CREVCORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED—
Sep 14, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 13, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 11, 2022CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Sep 9, 2022DOCKASSIGNED TO EXAMINER—
Jul 12, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 8, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 7, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance