Drawing for SETBOARD ORIENTED STRAND BOARD

USPTO serial 79345760

SETBOARD ORIENTED STRAND BOARD

Reviewed by CopyMark Law Group

Reg. 7251207Status 700Registered
Filing date
Status date
Registration date
Dec 26, 2023
Examiner
LAVACHE, LINDA M
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SETBOARD ORIENTED STRAND BOARD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

L. Jeremy Craft

L. Jeremy Craft CRAFT CHU PLLC1204 Heights BoulevardHouston, TX 77008UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
019Unformed materials, namely, natural stone, sand, and natural pebble stones; gravel; asphalt; bitumen; cement; non-agricultural lime for use in construction; plaster; concrete; block marble; materials made and shaped from concrete, plaster, clay, stone, marble, wood, plastic and synthetic materials for building, construction, road construction and similar purposes, namely, concrete blocks, bricks, posts, slabs and panels for building, plaster boards, clay tiles, natural stone tiles, marble building slabs, hardwood flooring, plastic wallboards and artificial stone tiles; portable non-metal buildings; non-metal structures, namely, non-metal pillars for building, crash barriers not of metal, asphalt-based heat-sealable coatings for use on roofs, walls and pavements, bitumen boards for roofs, bituminous coatings for roofing, and non-metal doors and windows made of wood and synthetic materials; non-metal non-mechanical, non-illuminated traffic signs for roads; monuments and sculptures made of concrete, stone or marble; glass products for constructions, namely, building glass; prefabricated swimming pools, not made of metal; aquarium sandACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 21, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 29, 2024XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Mar 28, 2024XXCRGENERIC MADRID TRANSACTION CREATED—
Mar 26, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 26, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 26, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 10, 2023GPNXNOTIFICATION PROCESSED BY IB—
Oct 10, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 10, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 21, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 20, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 20, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 5, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 5, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Sep 5, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 5, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 5, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 15, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 14, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 14, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 5, 2023RFNTREFUSAL PROCESSED BY IB—
Mar 15, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 15, 2023RFRRREFUSAL PROCESSED BY MPU—
Mar 14, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 13, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 7, 2023DOCKASSIGNED TO EXAMINER—
Jul 26, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 22, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 21, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance