Drawing for FLEXASU

USPTO serial 79346934

FLEXASU

Reviewed by CopyMark Law Group

Reg. 7272989Status 700Registered
Filing date
Status date
Registration date
Jan 16, 2024
Examiner
ANKRAH, NAAKWAMA S
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with FLEXASU?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mari-Elise Paul

Mari-Elise Paul Stites & Harbison PLLC1800 Diagonal Road, Suite 325Alexandria, VA 22314UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Air condensers; compressors for industrial gas processing; pumps for industrial gas processing; expansion machines, namely machines for expanding high pressure gas to drive compressors and generators; turbines, other than for land vehicles; mechanical apparatus in the nature of adsorption apparatus for liquefying and breaking down air; mechanical apparatus/machines in the nature of adsorption apparatus for producing, separating, liquefying industrial gases and gas mixtures, refinery gases and natural gas; pipe fittings for gas technology machines and machine components, in particular pressure regulators, closure, relief and non-return valves; air and hydrocarbon gas-operated power generators and apparatus for producing air and hydrocarbon gas; apparatus for liquefying and/or separating gases and gas mixtures, in particular air and hydrocarbon gases, gas extraction apparatus, gas separatorsACTIVE—
011Apparatus for steam generating, refrigerating, ventilating, fumigating and gas supply, and gas supply installations; evaporators for industrial gas processing; apparatus for industrial gas processing of air or hydrocarbon gas being membrane apparatus and distillation apparatus for generating air or hydrocarbon gas; regulating accessories for gas apparatus and gas pipes; industrial scrubbers for removing gases or particulate matter from the air during industrial processing, namely, gas purifiers, gas scrubbers, adsorbers and adsorber installations, diaphragm gas separators; gas purification apparatus and machines for purifying and evaporating industrial gases and gas mixtures, refinery gases and natural gasACTIVE—
042Research in the field of gas separating and engineering in connection therewith; technological consultancy and engineering in the field of cryogenic engineering, chemistry and petrochemistry, gas application technology, machine and installation construction; engineering services, particularly technical project planning and design engineering of basic and detailed engineering design and planning, and modification in connection with gas technology, cryogenic engineering, chemical and petrochemical apparatus and installationsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 13, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
May 27, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 17, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 17, 2024FIMPFINAL DISPOSITION PROCESSED—
Apr 16, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 16, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 16, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 16, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 31, 2023GPNXNOTIFICATION PROCESSED BY IB—
Oct 31, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 31, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 11, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 11, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 11, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 27, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 23, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 22, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 22, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 13, 2023RFNTREFUSAL PROCESSED BY IB—
Mar 22, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 22, 2023RFRRREFUSAL PROCESSED BY MPU—
Jan 26, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 25, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 20, 2023DOCKASSIGNED TO EXAMINER—
Aug 16, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 12, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 11, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance