USPTO serial 79347298
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Cathleen E. Stadecker
Cathleen E. Stadecker Downs Rachlin Martin PLLC199 Main Street, PO Box 190Burlington, VT 05402UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Downloadable and recorded software for construction site supervision and for automatic collection, organization and analyzation of construction data; Downloadable and recorded computer programs for construction site supervision and for automatic collection, organization and analyzation of construction data; Computer interfaces; Downloadable and recorded calculation software; Downloadable and recorded structural calculation software in the field of construction; Downloadable and recorded simulation software for construction site supervision and for automatic collection, organization and analyzation of construction data; Downloadable and recorded remote diagnosis software for construction site supervision and for automatic collection, organization and analyzation of construction data; Downloadable software for remote monitoring and analysis of construction sites, including for analysis of data concerning construction work; Downloadable and recorded structural analysis software; Downloadable and recorded software for three-dimensional modeling of buildings and structures; Downloadable and recorded graphics software for computers; Downloadable and recorded building information modelling (BIM) software; Downloadable and recorded computer-aided design (CAD) software for graphic restitution of construction data; Downloadable and recorded computer-aided engineering (CAE) software for restitution of construction data; Downloadable and recorded artificial intelligence software for construction site supervision and for automatic collection, organization and analyzation of construction data and for automatic learning in the field of construction; Downloadable and recorded software for construction work planning, execution, management and monitoring; Downloadable and recorded software for detection, signaling and technical management of defects, errors, failures and leaks in civil engineering structures; Downloadable and recorded software for extraction, processing, analysis, modeling and transmission of data, including data concerning construction work; Data sensors in the nature of distance, height and depth measuring sensors, 3D distance, height and depth measurement sensors, force sensors, laser sensors, signal processing units; Intelligent gateways for real-time data analysis in the nature of downloadable and recorded computer programs for construction site monitoring | ACTIVE | — |
| 037 | Carrying out in the nature of building construction, supervision in the nature of building construction supervision and follow-up in the nature of building construction maintenance of constructions, public works, engineering structures and civil engineering, drilling, excavation of trenches or walls in the ground, injections of products in the ground particularly for consolidation or sealing thereof; Carrying out in the nature of building construction, supervision in the nature of building construction supervision and follow-up in the nature of building construction maintenance of the installation of reinforcements or tie rods to consolidate the ground; Building construction services, including rehabilitation, renovation, repair and maintenance of engineering structures, infrastructure, underground, maritime and river works and industrial sites, particularly ports, dams, factories, viaducts, bridges and roads; Building construction services including supervision and monitoring of earthworks, building works and public works; Building construction supervision; Information on construction | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 22, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 18, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 26, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 26, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 21, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 21, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Nov 21, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 5, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 5, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 4, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 16, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 16, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 16, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 1, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 1, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 1, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 1, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 1, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 18, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 18, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 18, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 20, 2023 | RFNP | REFUSAL PROCESSED BY IB | — |
| Mar 28, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 27, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 31, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 30, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 26, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 16, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 12, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 11, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |