Drawing for RELIABILITY SPACE

USPTO serial 79347376

RELIABILITY SPACE

Reviewed by CopyMark Law Group

Reg. 7014879Status 700Registered
Filing date
Status date
Registration date
Apr 4, 2023
Examiner
VAGHANI, MAYUR C
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RELIABILITY SPACE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Apparatus, installations and instruments for conducting, switching, transforming, transporting, distributing, storing, regulating and controlling electricity and energy, namely, electric wires, capacitors, voltage regulators, transformers, batteries; apparatus and installations for generation and supply of energy by means of solar energy, namely, solar panels for production of electricity; machines and apparatus for controlling electricity, namely, electrical controlling devices; computer hardware and downloadable and recorded software for the production, provision, transport, storage and distribution of electricity and energy; computer hardware and downloadable and recorded software for controlling electricity and energy and for controlling electrical systemsACTIVE—
037Construction, installation, repair, modification and servicing of substations and electrical substation systemsACTIVE—
042Industrial analysis in the nature of product failure analysis, evaluating overall product failure risk analysis of unexpected occurrences based on discussions, evaluations, and deep analysis of substation systems, and industrial research services concerning installations and apparatus used for the production, provision, transport, storage and distribution of electricity and energy; design and development of computer hardware and software used for the production, provision, transport, storage and distribution of electricity and energy; design and development of computer hardware and software for use in controlling electricity and energy and controlling electrical systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 1, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 9, 2023CHLDCHANGE OF OWNER RECEIVED FROM IB—
Aug 15, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 25, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 25, 2023FIMPFINAL DISPOSITION PROCESSED—
Jul 4, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 4, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Apr 4, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 25, 2023GPNXNOTIFICATION PROCESSED BY IB—
Jan 17, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 17, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 4, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 4, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Dec 28, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 9, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 8, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 7, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 7, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 7, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 7, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 7, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 21, 2022RFNTREFUSAL PROCESSED BY IB—
Nov 10, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 10, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 10, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 28, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 28, 2022RFRRREFUSAL PROCESSED BY MPU—
Sep 3, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 2, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 29, 2022DOCKASSIGNED TO EXAMINER—
Aug 20, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 16, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 12, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance