USPTO serial 79347451
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Joshua S. Frick
Joshua S. Frick Barnes & Thornburg LLPOne North Wacker Drive, Suite 4400Chicago, IL 60606UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Prefabricated bridge structures of metal; Prefabricated metal bridges; Metal railings for fences, balconies, bridges and metal mine working platforms; Transportable, portable, modular building structures of metal; Building structures of metal, namely, framework of metal for building, frames of metal for building and steel frame for building; Building structures of metal, namely, construction elements made of metal, namely, fabricated metal components for building foundations; Building structure extensions of metal, namely, modular metallic buildings to add to existing building structures; Frames of metal for structures, namely, frames of metal for building, greenhouse frames of metal and door frames of metal; Frames of metal for structures, namely, window frames of metal, cold frames of metal and frames of metal for sliding doors; Structural steels, namely, steel rebars, rods, and mesh used for strengthening and reinforcing concrete structures, steel frames for building, steel angles for use in building construction; Structural steels, namely, steel chains, steel wire rope and steel alloys; Structural steelwork, namely, steel pipes and tubes; Structural steelwork, namely, steel plates and sheets; Tank structures of metal, namely, metal storage tanks, industrial water tanks of metal, liquefied gas storage tanks of metal; Tank structures of metal, namely, metal fluid storage tanks; Tank structures of metal, namely, metal tanks for mineral processing; Welded metal structures, namely, metal shelter structures, metal structures for mounting solar panels, prefabricated metal structures with flexible covers for agricultural, commercial or industrial storage; Welded metal structures, namely, portable metal structures with flexible covers for agricultural, commercial or industrial storage; Welded metal structures, namely, modular metal structures with flexible covers for agricultural, commercial or industrial storage and metal structures in the nature of ramps for docking and storing boats; Working platforms structures, namely, metal mine working platforms and metal scaffolding; Working platforms structures, namely, metal mine drilling and working platforms; gratings of metal; handrails of metal for stairs * industrial structures; * exterior * handrails of metal for use in buildings * , and interior handrails of metal for use in industrial and gathering buildings * ; handrails of metal for walkways; Chutes of metal for moving cattle, goods, trash, other than parts of machines; Gravity conveyors being chutes of metal for moving cattle, goods, trash; Wear resistant linings of metallic materials being wall linings of metal for building, linings of metal for building, sheet metal linings | ACTIVE | — |
| 007 | Belt conveyors; Conveyors being machines for use in mines; Mine working machines, namely, mine borers, mining drill sharpeners, drills for the mining industry, elevators for use in mines, coal loaders; mining machines; Machines for use in mines, namely, mine borers, mining drill sharpeners, drills for the mining industry, elevators for use in mines, coal loaders; Machines for use in mines, namely, mining bits, rubber tracks being parts of mining machines, truck mills for mining purposes; Balancing machines for stacker mining, reclaimer mining and ship loader mining | ACTIVE | — |
| 042 | Shop design, namely, shop detailing design in engineering drawing, involves creating detailed drawings and specifications for various components of a structure or machine; Quality control for others; Quality control of goods and services; Quality control being inspection of metal goods for quality control purposes; Engineering services in the nature of provision of engineering reports; industrial design; engineering project management services; engineering drawing; industrial engineering design services; Mechanical engineering design services; structural engineering design services; engineering design; design of industrial products; design of industrial machinery; design of electrical systems; design of electronic systems; design of instruments; design of pipelines; development of industrial machinery; development of industrial processes; Design planning, namely, initial planning of engineering drawing in mining project design * ; all the aforesaid services in context of industrial structures * | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 3, 2025 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| May 24, 2025 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 28, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 6, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 6, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 29, 2024 | NURC | NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED | — |
| Sep 25, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 24, 2024 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Sep 24, 2024 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Sep 24, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 25, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 25, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 26, 2024 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| May 19, 2024 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Feb 13, 2024 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Feb 6, 2024 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Jan 24, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 24, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jan 9, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 9, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 8, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 20, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 20, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 20, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 1, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 10, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 3, 2023 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Nov 3, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 3, 2023 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Nov 2, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 2, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 5, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 31, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 9, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 9, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 21, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 20, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 14, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 23, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 19, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 18, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |