Drawing for T.EN TECHNIP ENERGIES

USPTO serial 79348070

T.EN TECHNIP ENERGIES

Reviewed by CopyMark Law Group

Reg. 7226989Status 700Registered
Filing date
Status date
Registration date
Nov 28, 2023
Examiner
ALLEN, BIANCA LEIGH
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with T.EN TECHNIP ENERGIES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey M. Becker

Jeffrey M. Becker Haynes and Boone, LLP2323 Victory Avenue, Suite 700Dallas, TX 75219UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Construction services, namely, building construction; construction of public works and rural works, namely, offshore oil and gas facility constructions, pipeline construction, concrete pouring and forming for building and other commercial or public concrete structures, construction of underground utilities and housing pads, construction of oil and gas facilities, petrochemical and energy refineries and plants; construction work supervision being construction management; information with respect to construction; construction, maintenance and repair of industrial installationsACTIVE—
041Training services for industrial installations, namely, providing specialized professional training to employees in the fields of in process operations, factory maintenance, analytical control of process and product flows, environmental protection and safety, project management and factory construction, customized training solutions integrating an interface design and advanced learning methods, dynamic simulation of operator training (OTS), coordinating the procurement and improvement of process control skills and solving operator problemsACTIVE—
042Industrial plant design services, namely, conceptual process studies, consolidation of process assemblies, basic studies required to support a set of technical design all containing the data necessary to a competent contractor for carrying out detailed engineering in the nature of engineering design services; detailed engineering services for industrial plants, namely, online non-downloadable software for purchasing material, developing diagrams for pipework and instruments published for the construction, developing detailed pipework drawings, including measuring and stress calculations, drafting detailed drawings relating to instrumentation, to electrical installations and to civil engineering works, managing supplier designs, controlling costs and bill books, start-up procedures, developing diagrams for pipework and process instruments and public services published for the detailed engineering, drafting detailed maps of hazardous areas and plots, drafting the main diagrams for pipework, instrumentation, electricity and civil engineering; maintenance engineering services for industrial plants; converting existing printed courses to digital media formats, namely, conversion of data or documents from physical to electronic media; commissioning of industrial installations, namely, online non-downloadable software for construction management, 3D construction systems, subdivision of the system via the 3D model enabling 3D viewing of the systems and improving pre-commissioning and commissioning studies during the engineering phase, tracking the progress of construction, precommissioning, and commissioning up to the delivery of quality assurance and quality control statistics and reports, interface management between different phases of the project lifecycle, with the phases being engineering, construction, pre-commissioning, and commissioning; industrial design; architecture, namely, architectural services; research and development of industrial systems and equipment; technical research in the fields of engineering, design, construction, project management and processing technologiesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 26, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 29, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 29, 2024FIMPFINAL DISPOSITION PROCESSED—
Feb 28, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 28, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Nov 28, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 3, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Oct 29, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 12, 2023GPNXNOTIFICATION PROCESSED BY IB—
Sep 12, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 12, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 23, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 23, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 23, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 9, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 8, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 7, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 7, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 2, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 2, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 2, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 5, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jun 5, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 5, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 3, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 27, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 27, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 21, 2022RFNPREFUSAL PROCESSED BY IB—
Oct 28, 2022RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 27, 2022RFRRREFUSAL PROCESSED BY MPU—
Sep 2, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 1, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 30, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 26, 2022DOCKASSIGNED TO EXAMINER—
Aug 26, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 25, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance