USPTO serial 79348736
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Richard Y. Kim
Richard Y. Kim Snell & Wilmer L.L.P.One East Washington Street, Suite 2700Phoenix, AZ 85004-2556UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Non-metallic minerals, namely, processed limestone not for building or construction, silica, magnesium carbonate, magnesite, basaltic minerals and captured carbon, all for industrial purposes; fertilizers; chemicals, namely, biological preparations for industrial use; mineral fertilising preparations; mineral substances in the nature of filtering media for use in chemical processing, capturing carbon and carbon dioxide sequestration; chemical agents for carbon dioxide sequestration; catalysts for use in the control of carbon dioxide emissions; silicate material, namely, olivine, serpentine, silica, and amorphous silica, all for industrial use and for use in carbon dioxide sequestration, control of carbon dioxide emissions, and industrial fillers; silicates; soil improving agents; soil additives; mineral fertilizers, namely, minerals for use as limestone substitute for agricultural purposes | ACTIVE | — |
| 019 | Building materials, namely, limestone, silica stone and non-metallic minerals for building or construction; building materials made of rock fibres, namely, limestone, silica stone and non-metallic minerals for building or construction; mineral pellets for use in the building industry; minerals for use in construction, namely, non-metallic minerals for building or construction; building and construction materials and elements made of sand, stone, rock, clay, minerals and concrete, namely, sand, natural stone, limestone, building stone, rock crystal, clay ash, non-metallic minerals for building or construction and concrete | ACTIVE | — |
| 040 | Treatment of industrial waste to sequester carbon; generation of electrical power using carbon sequestration; catalytic conversion of chemical compounds; rental of equipment for the treatment and transformation of materials, for energy production and for custom manufacturing, namely, rental of chemical processing machines, rental of carbon capture machines and rental of carbon dioxide sequestration machines, rental of equipment for the sequestration of carbon dioxide, rental of chemical processing equipment, rental of equipment for the processing of industrial raw minerals; recycling of minerals; purification of minerals; waste processing, namely, extraction of minerals contained in waste residues; recycling services; mineral processing; processing of minerals for the purpose of absorbing CO2; environmental remediation services, namely, treatment of soil; extraction of minerals contained in waste residues, namely, waste processing for the sequestration of carbon dioxide by mineral extraction and waste processing by the extraction of metallic and non-metallic minerals | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 23, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 28, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 28, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 19, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 3, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 19, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Dec 19, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 4, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 3, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 3, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 13, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 13, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Sep 13, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 30, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 29, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 29, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 29, 2023 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jul 29, 2023 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jul 29, 2023 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 29, 2023 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 28, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 28, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 28, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 10, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 14, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 14, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 24, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 23, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 16, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 4, 2023 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Oct 16, 2022 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Sep 6, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 2, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 1, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |