Drawing for STARMATRIX

USPTO serial 79349297

STARMATRIX

Reviewed by CopyMark Law Group

Reg. 7135125Status 700Registered
Filing date
Status date
Registration date
Aug 15, 2023
Examiner
YOUNG, CARRIE SKYE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with STARMATRIX?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Prakash NAMA

121 Moore StPrinceton, NJ 08540UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001Vegetable substances in the nature of filtering materials for use in the water purifying industry; chemical preparations in the nature of filtering materials for use in the water purifying industry; mineral substances in the nature of filtering materials for use in the water purifying industry; ceramic particles for use as a filtering media in the water purifying industry; activated carbons for filters in the field of water treatment; unprocessed plastics in the nature of filtering materials for use in the water purifying industryACTIVE—
007Aerating pumps for aquaria; centrifugal pumps; water pumps for water filtering units for use in swimming pools; filters for cleaning cooling air, for engines; filters being parts of cleaning machines in the field of water treatment; cleaning machines for ponds and swiming pools; water heaters being parts of machines; reeling apparatus, mechanical, namely, reels, mechanical, for flexible hoses; pumps for machinesACTIVE—
011Water conduits installations, namely, flexible plastic pipes for plumbing purposes; swimming pool chlorinating apparatus; hot water heating installations; anti-splash tap nozzles; ornamental fountains; bath installations; water purification installations; water filtering apparatus; radiators, electric; faucets for pipes and pipelines being parts of sanitary installations; faucets; mixer faucets for water pipes; showers; solar collectors for heating; solar water heaters; shower platforms; shower heads; shower head sprayersACTIVE—
017Flexible hoses, not of metal; watering hose; rings of rubber for use as pipe connection seals; stuffing rings of rubber or plastic; watertight rings for plumbing pipes; pipe gaskets; fittings, not of metal, for flexible pipes; junctions, not of metal, for pipes; fittings, not of metal, for rigid pipesACTIVE—
019Wood, semi-worked, for making household utensils; rock crystal; non-metal doors; penstock pipes, not of metal; ducts, not of metal, for ventilating and air-conditioning installations; reinforcing materials, not of metal, for building; transportable buildings, not of metal; non-metal swimming pools; building glassACTIVE—
022Wadding for filtering; raw fibrous textile; awnings of textile; tentsACTIVE—
028Inflatable swimming pools as play articles; inflatable toys; body-building apparatus; stretching exercise machines; inflatable swimming floats; playing cards; party games; swimming rings; balls for sportsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 11, 2023FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 16, 2023FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 16, 2023FIMPFINAL DISPOSITION PROCESSED—
Nov 15, 2023FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 15, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 15, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 31, 2023GPNXNOTIFICATION PROCESSED BY IB—
May 30, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 30, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 10, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 10, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 10, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 27, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 18, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 18, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 18, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 15, 2023RFNTREFUSAL PROCESSED BY IB—
Feb 23, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 23, 2023RFRRREFUSAL PROCESSED BY MPU—
Dec 28, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 27, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 27, 2022DOCKASSIGNED TO EXAMINER—
Sep 23, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 19, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 16, 2022LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Sep 15, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance