USPTO serial 79349683
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Rebecca Liebowitz
Rebecca Liebowitz Venable LLPPO Box 34385Washington, DC 20043-9998UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Complete cathodic protection installations comprised of anodes, cathodes, power supplies, electrical cells, computer monitors, test stations for fuel cells, electronic data recorders, probes for testing integrated circuits, stray electrical and alternating current corrosion coupons in the nature of metal weight test strips used in the testing for internal corrosion monitoring and holders therefore, computers and downloadable computer software for use in monitoring of internal corrosion, for managing cathodic protection and corrosion mitigation systems, and for tracking cathodic protection and corrosion mitigation systems; computer work stations comprising ultrasonic scanning instruments in the nature of scanners, electrical transducers, video displays and recorders, transmitters of electronic signals, data and video receivers, electric sensors, computer monitors, remote computer monitors and data collectors in the nature of electronic data loggers; downloadable software for use in the field of corrosion and cathodic protection, for use in data management and risk assessment; downloadable software for tank leak detection and monitoring for cathodic protection systems; sacrificial and impressed current anodes, cathodes, rectifiers, power supplies, test stations for fuel cells, computer electrical terminal boxes, splitter panels in the nature of signal splinters for electronic apparatus, probes for testing integrated circuits, stray electrical and alternating current corrosion coupons in the nature of metal weight test strips used in the testing for internal corrosion monitoring and holders therefore, electrical meters, data and video recorders, reference photovoltaic cells, electrodes, measuring photovoltaic cells, grounding photovoltaic cells, electrical connectors, metal grounding electrical cable clamps for use only as parts and fittings for coaxial cable, and not for non-electric cable or machinery or machine parts, electrical connections, analytical electric meters and instruments, namely, ammeters, voltmeters, resistance meters and potential meters; shunts in the nature of electric current control devices and current interrupters in the nature of electric current control devices; metal detectors for electronic pipe, cable and underground and submerged metal; electrical conductors, cables and wires; wire and cable splicing kits comprised of power strips; wire and cable splicing kits comprised of sleeves for electric cables; solar power supplies, cathodic protection thermoelectric generator power supplies, ionic and electronic conductive electrolytes and backfills in the nature of electronic multipliers; voltage surge protectors; gas sensors for measuring gas concentration; electric reels for electric wire; pipeline electrical insulating supplies, namely, insulated electric wires and cables and automatic valves for insulating pipelines; probe interface modules in the nature of probes for testing and measuring corrosion; ultrasonic scanning instruments in the nature of ultrasonic sensors, scanners, electrical transducers, video displays and recorders, transmitters of electronic signals, data and video receivers, electric sensors, computer monitors, remote computer monitors and data collectors in the nature of electronic data loggers, stray electrical and alternating current corrosion coupon holders in the nature of metal weight test strips for use in the testing for internal corrosion monitoring | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 2, 2025 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Apr 29, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 8, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 8, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 2, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 2, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 2, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 17, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 17, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 17, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 27, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 27, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Sep 27, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 11, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 11, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 11, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 11, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 11, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 31, 2023 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jul 31, 2023 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 31, 2023 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 28, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 28, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 28, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 7, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 15, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 15, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 20, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 19, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 14, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 20, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 16, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 15, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |