Drawing for POSSIBILITY IN EVERY DROP

USPTO serial 79350509

POSSIBILITY IN EVERY DROP

Reviewed by CopyMark Law Group

Reg. 8396975Status 700Registered
Filing date
Status date
Registration date
Aug 18, 2026
Examiner
LOZEAU, BRANDON THOMAS
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with POSSIBILITY IN EVERY DROP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

ANDREA S. FUELLEMAN

ANDREA S. FUELLEMAN NEAL, GERBER & EISENBERG LLPTWO NORTH LASALLE STREETSUITE 1700CHICAGO, IL 60602

Goods and services

ClassDescriptionStatusFirst use
007Circulating pumps; centrifugal pumps; electric water pumps; pumps for water supply; pumps for fresh and polluted water; electric pumps for industrial purposes; pumps for fuel oil for use in motors and engines; hydraulic pumps; air compressor pumps; regulation and control mechanisms for pumps, namely, pump control valves, drain cocks, mechanical seals being machine parts and automatic regulation valves for use in connection with pumps and pumping plants; electric motors, not for land vehicles; air filters being parts of machines or engines, namely, air filters for mechanical purposes; structural parts and accessories for the aforementioned goodsACTIVE—
009Apparatus and instruments for measuring, dosage and checking the operation, proper function and proper pressure of pumps, namely, automated pump monitoring systems consisting primarily of computer hardware, computer monitors, downloadable computer software for database management and data processing, and electronic sensors for sensing pump performance and water flow; Downloadable application software for the operation and supervision of pumps and pump operating systems and computer hardware, fire-extinguishing apparatus and sprinkler systems for fire protection; structural and replacement parts and accessories not included in other classes for automated pump monitoring systems; Downloadable application software for the operation and supervision of pumps and pump operating systems; downloadable data processing software; Downloadable software for the operation and supervision of pumps and pump operating systems; Downloadable software for tablet computers for the operation and supervision of pumps and pump operating systems; Downloadable application software for the operation and supervision of pumps; Electric and electronic control units in the nature of regulators, namely, electrical controllers for use with pumps and pump operating systems; electronic indicator panels for pumpsACTIVE—
011Apparatus and installations for heating, steam generating, refrigerating, air-conditioning, and water supply, in particular, water distribution installations and water supply installations, namely, pumps that cool surrounding air by circulating cold water, water treatment units for aerating and circulating water, temperature control valves being thermostatic valves for water, and apparatus and installations for sanitary purposes, namely, water control valves for faucets; heat pumps; Apparatus and installations for heating, namely air heaters; Apparatus and installations for ventilating, namely ventilating fans for commercial and industrial use; machines and installations for treatment and purification of water and sewage; slurry treatment units for stabilizing and sanitizing slurry; disinfectant apparatus for disinfecting water; water purification installations; water purifying apparatus and machines; machines and installations for treatment and purification of slurry, water and sewage; Structural component and replacement parts for the aforementioned goodsACTIVE—
037Installation, repair and maintenance of water pumps and structural parts thereof; drilling of wells; consultancy concerning water extraction; pipeline construction and pipeline installation and repair in relation to pipelines for gas, water and wastewater; Advisory services relating to the installation of water pumps; repair of water supply installations; construction of water supply installationsACTIVE—
039Transportation of goods, namely water transport services; water distribution services; Transport of water through pipes, namely, distribution and supply of water through pipes; providing information relating to water supplying services; public utility services in the nature of supplying water; consultancy concerning water supplyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 17, 2026LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Aug 18, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 18, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 27, 2026TMBNTTAB RELEASE CASE TO TRADEMARKS—
Jul 27, 2026OP.TOPPOSITION TERMINATED NO. 999999—
Jul 27, 2026OP.DOPPOSITION DISMISSED NO. 999999—
Oct 19, 2024RFNTREFUSAL PROCESSED BY IB—
Aug 29, 2024IRRFIRREGULARITY ON REFUSAL FROM IB—
Jul 1, 2024ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Jul 1, 2024OP.IOPPOSITION INSTITUTED NO. 999999—
Jun 27, 2024OPNSOPPOSITION NOTICE (IB REFUSAL) SENT TO IB—
Jun 27, 2024OPNCOPPOSITION NOTICE (IB REFUSAL) CREATED—
Mar 21, 2024ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Mar 18, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 4, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 28, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 28, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 27, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 26, 2024GPNXNOTIFICATION PROCESSED BY IB—
Feb 7, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 7, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 7, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 7, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 23, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 22, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Jan 22, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 22, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 22, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 2, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 2, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 2, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 6, 2023RFNTREFUSAL PROCESSED BY IB—
May 15, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 15, 2023RFRRREFUSAL PROCESSED BY MPU—
Mar 25, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 24, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 23, 2023DOCKASSIGNED TO EXAMINER—
Sep 27, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 23, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 22, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance