Drawing for ZASCHE

USPTO serial 79350702

ZASCHE

Reviewed by CopyMark Law Group

Reg. 7369464Status 700Registered
Filing date
Status date
Registration date
Apr 30, 2024
Examiner
GEARHART, JESSICA SHEA
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ZASCHE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael R. Gilman

Michael R. Gilman Kaplan Breyer Schwarz LLP197 State Route 18, South WingSuite 3000East Brunswick, NJ 08816

Goods and services

ClassDescriptionStatusFirst use
007Machines for lifting and lowering loads, in particular mechanical lifting and telescopic lifting apparatus; Mechanical cranes, especially column cranes and slewing cranes; Mechanical apparatus for handling loads; Load handling modules, namely mechanical apparatus for rotating and slewing loads; Motors and engines, except for land vehicles, particularly motors and engines for drives in the field of handling objects and loads; Machine coupling and transmission components, except for land vehicles; Handling apparatus, in particular mechanical apparatus for handling objects and loads; Handling apparatus, in particular in processing and implementation processes; Manipulators, namely, handling machines for lifting and transposing machine parts, materials, tools and equipment in manufacturing processes; Handling cranes; Lifting apparatus being equipment for lifting and moving loads in a levitating manner; Motors and engines, drives, parts of machines and controllers for operating machines for lifting and lowering loads; Cranes being lifting machines, in particular suspension crane installations and accessories therefor, namely rails, trolley frames, energy feeders and brakes; Cranes being lifting machines, in particular articulated arms, jib cranes, parallelogram apparatus, telescopes and lifting axes; Cable cranes, especially rope balancers and rope winches; Parts of machines for the operation of lifting apparatus, namely load-handling devices; Controllers for lifting apparatus, handling cranes and manipulatorsACTIVE—
009Electrical and electronic apparatus and instruments for controlling and monitoring machines for lifting and lowering loads; Programmable electronic controllers, in particular for manipulators and industrial crane installations; Electronic controllers for servo motors; Downloadable software for controlling lifting and hoisting apparatus; Wireless controllers to remotely monitor and control the function and status of handling apparatus and lifting machinesACTIVE—
037Installation, assembly, repair and maintenance of machines, mechanical apparatus and installations composed thereof and parts thereof for conveyor and lifting technologyACTIVE—
042Design and development of computer hardware and software; Technical consultation services, namely technical investigations and examinations for the purpose of environmental assessments; Engineering in the fields of technical planning and development of ergonomically designed materials and equipment handling apparatus; Technical consultancy relating to the design, planning and development of handling and lifting technology for handling and lifting objects and loads; Mechanical engineering, electrical engineering and conveyor technology services relating to lifting and handling apparatusACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 17, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 26, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 26, 2024FIMPFINAL DISPOSITION PROCESSED—
Jul 30, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 30, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Apr 30, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 18, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Feb 28, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 28, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 14, 2024GPNXNOTIFICATION PROCESSED BY IB—
Feb 13, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 13, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 24, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 24, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 24, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 10, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 29, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 29, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 29, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 18, 2023RFNTREFUSAL PROCESSED BY IB—
Jun 1, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 1, 2023RFRRREFUSAL PROCESSED BY MPU—
Apr 4, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 3, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 24, 2023DOCKASSIGNED TO EXAMINER—
Sep 30, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 26, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 22, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance