Drawing for SALAMANDER QUICK LIFT

USPTO serial 79351068

SALAMANDER QUICK LIFT

Reviewed by CopyMark Law Group

Reg. 7324449Status 700Registered
Filing date
Status date
Registration date
Mar 12, 2024
Examiner
STADELI, MARTA ANN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SALAMANDER QUICK LIFT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alexander Lazouski

Alexander Lazouski LAZOUSKI IP LLCSUITE 1, 14726 BOWFIN TER.LAKEWOOD RANCH, FL 34202UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Lifting and hoisting equipment, namely, hydraulic lifts and hoists; elevators and escalators; elevating apparatus, namely, elevators, elevating work platforms, cranes; elevating apparatus to facilitate service and maintenance of wind power plants and towers, namely, elevators, elevating work platforms, mechanical and hydraulic lifts, hoists, cranesACTIVE—
037Building, construction, and demolition, namely, building construction, building demolition, wind power plant construction, wind power plant demolition; construction and repair of energy production plants; building and construction of wind power plants; advisory services relating to building and construction of wind power plants and towers; rental of lifting apparatus for use in construction; maintenance and repair of wind power plants and towersACTIVE—
042Scientific and technological services, namely, scientific research, analysis, and testing in the field of lifting and hoisting equipment, and building, construction and demolition; scientific and technological research services in the field of lifting and hoisting equipment, and building, construction and demolition; product research and development related to the energy sector; design and development of lifting and hoisting equipmentACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 11, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 19, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 19, 2024FIMPFINAL DISPOSITION PROCESSED—
Jun 13, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 25, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 12, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Mar 12, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 6, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 6, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Dec 26, 2023GPNXNOTIFICATION PROCESSED BY IB—
Dec 26, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 26, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 6, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 6, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Dec 6, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 20, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 19, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 18, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 18, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 4, 2023RFNTREFUSAL PROCESSED BY IB—
Jun 11, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 11, 2023RFRRREFUSAL PROCESSED BY MPU—
May 2, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 1, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 1, 2023RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Apr 30, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 29, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 19, 2023DOCKASSIGNED TO EXAMINER—
Feb 18, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Oct 4, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 30, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 29, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance