USPTO serial 79352252
Reviewed by CopyMark Law Group
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 011 | Hydrogen generation plants for industrial use; Hydrogen generators for industrial use; hydrogen generation plants using steam reforming; steam reformers for use in generating hydrogen gas; gas condensers, other than parts of machines; gas boilers; gas scrubbing apparatus; regulating and safety accessories for gas apparatus; regulating and safety devices for gas installations and pipes; pressure supervision apparatus [safety apparatus for gas pipes]; cooling installations for gas; installations for the collection of gases; separators for scrubbing gas; regulating apparatus for gas pipe installations; installations for processing nuclear fuel and nuclear moderating material; solar photovoltaic hydrogen generation systems with solar radiation concentrators, solar collectors and panels, heaters for obtaining solar energy, thermal solar panels, heat regenerators; solar collectors with heat evacuation tubes [heat exchangers]; photovoltaic solar heating systems with solar radiation concentrators, solar collectors and panels, heaters for obtaining solar energy, solar thermal panels, heat regenerators; installations and apparatus for heating including solar cell panels and solar power stations containing installation equipment therefor and solar cell panels; heat accumulators, heat pumps; solar-powered water treatment apparatus | ACTIVE | — |
| 040 | Production, treatment, processing, transformation and recycling of energy, electrical energy, solar energy, fuels, motor fuels and other energy sources and hydrogen; Consultancy in relation to production, treatment, processing, transformation and recycling of electrical energy, solar energy, fuels, motor fuels, hydrogen and other energy sources; leasing of energy generating equipment | ACTIVE | — |
| 042 | Scientific and technological services and research and design relating thereto for hydrogen production; Industrial analysis, industrial research and industrial design services in relation to hydrogen production; design and development of hardware and software in the field of energy and renewable energies; industrial engineering, industrial research and industrial design services relating to production, treatment, processing, transformation and recycling of energy, electrical energy, solar energy, fuels, motor fuels and other energy sources and hydrogen; development and management of engineering projects in relation to hydrogen production; development of industrial processes for hydrogen production, storage and transportation; technical consultancy and auditing relating to energy and renewable energy production and use | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 31, 2024 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 12, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 11, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 1, 2024 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Mar 13, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 13, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Aug 10, 2023 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Aug 10, 2023 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Aug 10, 2023 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Feb 15, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 11, 2023 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jan 26, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 26, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 29, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 28, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 22, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 25, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 21, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 20, 2022 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Oct 13, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |