Drawing for E5

USPTO serial 79352272

E5

Reviewed by CopyMark Law Group

Reg. 7227037Status 700Registered
Filing date
Status date
Registration date
Nov 28, 2023
Examiner
ALLEN, BIANCA LEIGH
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with E5?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Emily Chilson

Emily Chilson Andrus Intellectual Property Law, LLP790 N. Water StreetSuite 2200Milwaukee, WI 53202

Goods and services

ClassDescriptionStatusFirst use
007Waste crushing machines, in particular shredders, for the recycling of fuel and waste materials; industrial separating installations and machines and industrial separators, namely, spiral wave separators being machines for separating target materials from mixtures of materials, in particular to separate, classify or sort waste and mixtures of soil, loam, clay, rock, plastic and metal, for extraction of raw materials, all for use in waste management and recycling and for use in the building material and mining industry; engines, powertrains, and machine parts and controls for the operation of machines and engines, namely, industrial engines, axles for machines, engine bearings, engine fuel pumps; machines and installations for waste processing, in particular waste sorting being separating machines; waste crushing machines for crushing scrap wood, rubble or bulky waste; waste crushing machines for crushing biowaste for composting; hydraulic rock breakers being machine tools for crushing rocks; crushing machines for industrial purposes, namely, impact grinding crushers; sifting machines, especially drum screening machines; wind sifting machines for removing light materials being plastics and plastic foils from crushed materials; composting machines, namely, special machines for the tipping and assembly of stacks for composting organic material; mixing machines for mixing bulk materials into a desired compost composition; mobile charging hoppers being mechanical discharging hoppers; packaging machines, in particular bagging machines; packaging machines, namely, installations for pressing and packaging waste for storage and conveying to a waste incineration installation; hydraulic, pneumatic, roller, and chain conveyors, and parts of conveyor apparatus, namely, belt conveyors, and machine parts for belt conveyors being belt drums for belt installations and large surface mining apparatus; non-abrasive blast cleaning machines, namely, apparatus for cleaning road signs or delineators on roads; apparatus for cutting hedges on roadsides, namely, vehicle-mounted power operated hedge cutters; apparatus for the maintenance and cleaning of filter tanks for water treatment, namely, cleaning machines for lifting and cleaning sand and gravel in filter tanks; sand and gravel washing installations being cleaning machines for cleaning sand and gravel; sifting machines for sifting sand and gravel in filter tanks; power-operated lawn and garden tools, namely, scarifiers for scarifying the flooring of filter tanks; straightening machines being raking machines for straightening the flooring of filter tanks; agricultural machinery being special harvesting machines for large areas and grassed banks in water treatment installations; special vehicles for the maintenance of traffic routes, other than transportation, namely, road sweepers, rollers, building machines, paving machines; cleaning machines for streets being street sweepers; snow ploughs; wheel loadersACTIVE—
012Commercial land vehicles, driving land vehicle motors; spreading land vehicles; land vehicles for transporting wheel loaders; all of the aforementioned goods for use in the water disposal and recycling industryACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 29, 2026CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Jun 27, 2025CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Mar 26, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 2, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 1, 2024FIMPFINAL DISPOSITION PROCESSED—
Feb 28, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 28, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Nov 28, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 12, 2023GPNXNOTIFICATION PROCESSED BY IB—
Sep 12, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 12, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 23, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 23, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 23, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 10, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 2, 2023DOCKASSIGNED TO EXAMINER—
Jul 18, 2023LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jun 28, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 27, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 27, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 28, 2023CHLDCHANGE OF OWNER RECEIVED FROM IB—
Apr 20, 2023RFNTREFUSAL PROCESSED BY IB—
Apr 3, 2023LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Mar 29, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 29, 2023RFRRREFUSAL PROCESSED BY MPU—
Feb 4, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 3, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 30, 2023DOCKASSIGNED TO EXAMINER—
Nov 19, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 18, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 14, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 13, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance