USPTO serial 79352676
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Miriam D. Trudell
Miriam D. Trudell Davis Graham & Stubbs LLP3400 Walnut Street, Suite 700Denver, CO 80205United States| Class | Description | Status | First use |
|---|---|---|---|
| 017 | Acoustic insulation barrier articles and materials in the nature of panels, tiles, slats and baffles; Insulation and barrier articles and materials, namely panels, tiles, slats and baffles; Fire resistant and fire preventive barrier articles and materials, namely panels, tiles, slats and baffles; Insulation sheets, namely wood, felt, plastic, aramid, glass, fiberglass, glass wool, carbon, composite, nylon, resin, polyurethane foam, polyethylene foam, metal foil and ceramic fibers and MDF (medium-density fiberboard); Insulating materials; Fire resistant acoustic insulation panels; Acoustic insulating panels | ACTIVE | — |
| 019 | Wood and artificial wood, namely trim, posts, veneers, boards, beams, joints, panelling, panels, siding, floors and flooring, frames, ceiling, walls and posts; Non-metallic building materials having acoustic properties, namely trim, posts, veneers, boards, beams, joints, panelling, panels, siding, floors and flooring, frames, ceiling, walls and posts; Acoustic wall panels, not of metal; Building materials of wood, namely trim, posts, veneers, boards, beams, joints, panelling, panels, siding, floors and flooring, frames, ceiling, walls and posts; Intumescent construction materials, namely trim, posts, veneers, boards, beams, joints, panelling, panels, siding, floors and flooring, frames, ceiling, walls and posts; Stone veneers in the nature of building materials; Fiberboard in the nature of building materials; Fire retardant non-metallic wall panels for use in construction; Construction materials of artificial stone, namely trim, posts, veneers, boards, beams, joints, panelling, panels, siding, floors and flooring, frames, ceiling, walls and posts; Interlocking panels non-metallic wall panels for building | ACTIVE | — |
| 020 | Furniture fillings, not of metal, namely wood, felt, plastic and MDF (medium-density fiberboard); Beds, bedding in the nature of mattresses, pillows and cushions; Furniture panels, namely felt slats, wooden sheets, wooden slats, plastic slats, MDF (medium-density fiberboard) sheets and MDF (medium-density fiberboard) slats; Wall partitions in the nature of furniture | ACTIVE | — |
| 035 | Providing office functions; The bringing together, for the benefit of others, of a variety of goods excluding the transport thereof, enabling customers to conveniently view and purchase those goods; the aforementioned only in relation to insulation articles and materials, fire preventive articles and materials, acoustic panels, building and constructions materials and elements and furniture and furnishings; Retail and wholesale store services relating to insulation articles and materials, fire preventive articles and materials, acoustic panels, building and construction materials and elements and furniture and furnishings | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 22, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 5, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 5, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 1, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 13, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 13, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 13, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 1, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 1, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 16, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 16, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 16, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 16, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 26, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 11, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 11, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 11, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 11, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 11, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 1, 2024 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Mar 13, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 13, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Oct 13, 2023 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 13, 2023 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 13, 2023 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 27, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 26, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 26, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 8, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 26, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 23, 2023 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Jun 6, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 6, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 8, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 7, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 1, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 17, 2023 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Dec 3, 2022 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Oct 18, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 14, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 13, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |