Drawing for ECO PERFORMANCE

USPTO serial 79353050

ECO PERFORMANCE

Reviewed by CopyMark Law Group

Reg. 7393919Status 700Registered
Filing date
Status date
Registration date
May 28, 2024
Examiner
HOWELL, MATTHEW P
Law office
TMO LAW OFFICE 123

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ECO PERFORMANCE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael T. Smith

Michael T. Smith Birch Stewart Kolasch & Birch LLP8110 Gatehouse Road, Suite 100EFalls Church, VA 22042UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Baskets of common metal; wire mesh; metal conduit; packaging trays of metal; cable supports made of metal in the nature of cable clamps of metal, cable ties of metal; ceiling supports of metal; ladder supports of metal, namely, metal rungs for metal ladders; ladders of metal; aluminium ladder rungs; cable clamps of metal; clips of metal for cables and pipes; metal brackets for use in the construction and assembly of decking, shelving, use as spacers; binding screws of metal for cables; suspension clamps of metal; racking structures of metal for supporting cables in the nature of cable clamps of metal, cable ties of metal; cable ducts made of metal other than for electricity for central heating installations, air-conditioning installations; metal materials for building and construction namely, floor panels, fascia, metal canopies, reinforcing materials of metal for building; road construction materials of metal, namely, non-electric metal cables; building materials of metal, namely, metal countertops for further installation; railway material of metal, namely, metal railway crossovers, railway points; fixing devices of metal in the nature of metal fasteners and metal joining components, namely, threaded studs, clamps, cramps, plugs, bolts, nails, rivets, screws and staples for construction or industry use; small items of metal hardware, namely, nuts, pulleys, springs; alloys of common metal; non-electric cable boxes of metal; poles of metal; all the foregoing goods are environmentally friendlyACTIVE—
009Electrical ducts; metal electrical ducts; electricity conduits; electric cable channels in the nature of cable connectors, cable jump leads, electric cables; electricity conduits in the nature of cable covers; electrical cable connections boxes; electric plug boxes, namely, switch boxes, junction boxes, power distributing boxes, electrical connection boxes; electric junction boxes; electrical distribution boxes; electrical power outlets; electrical wiring installations namely, wiring plates in the nature of protective sheaths for electrical wiring; electronic communication installations, namely, electronic communications systems comprised of computer hardware and recorded software for the transmission of data between multiple points; all the foregoing goods are environmentally friendlyACTIVE—
019Utility poles of non-metallic materials; posts, not of metal, for power lines; all the foregoing goods are environmentally friendlyACTIVE—
020Trays, not of metal, namely, tool and tool accessory trays not made of metal sold empty and parts and fittings therefor; cable supports made of plastics, namely, non-metal cable clamps; step ladders, not of metal; ladders made of glass fibre; ladders of wood or plastics; non-metal cable clamps; cable grips of non-metallic materials, namely, non-metal cable clips; non-metal pipe and cable clips; non-metal cable fasteners, connectors and holders, namely, non-metal cable clamps and non-metal cable clips; non-metal trunking for cables carrying telephone signals, namely, non-mechanical, non- metal reels for flexible hoses; non-metal trunking for carrying cables supplying electricity, namely, non-mechanical, non-metal reels for flexible hoses; non-metal cable trunking, namely, ducts of plastic for guiding cable and wires; cantilevered brackets of non-metallic materials other than for building, namely, non-metal mounting brackets for general use; non-metal trunking for leads carrying television signals, namely, non-mechanical, non-metal reels for flexible hoses; non-electric cable boxes of non-metallic materials for non-electric cables; poles, not of metal; all the foregoing goods are environmentally friendlyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 30, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 11, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 10, 2024FIMPFINAL DISPOSITION PROCESSED—
Aug 28, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 28, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 28, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 8, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 20, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 20, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 12, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 12, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 11, 2024GPNXNOTIFICATION PROCESSED BY IB—
Feb 21, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 21, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 21, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 21, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 2, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 2, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Feb 2, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 2, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 2, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 1, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 1, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 1, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Nov 11, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 29, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 29, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 29, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 6, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 5, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 5, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 29, 2023RFNPREFUSAL PROCESSED BY IB—
Mar 4, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 3, 2023RFRRREFUSAL PROCESSED BY MPU—
Jan 10, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 9, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 6, 2023DOCKASSIGNED TO EXAMINER—
Oct 25, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 21, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 20, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance