Drawing for LS E-MOBILITY SOLUTIONS

USPTO serial 79353183

LS E-MOBILITY SOLUTIONS

Reviewed by CopyMark Law Group

Reg. 7265398Status 700Registered
Filing date
Status date
Registration date
Jan 9, 2024
Examiner
O'BRIEN, JENNIFER LYNN
Law office
Historical data usage

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with LS E-MOBILITY SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Brent E.. Routman

Brent E.. Routman Merchant & Gould, P.C.P.O. BOX 2910150 SOUTH 5TH STREETMinneapolis, MN 55402

Goods and services

ClassDescriptionStatusFirst use
009Electric relay; [ computers for distributed control systems; ] electronic control systems for use in energy management system apparatus consisting of electric control devices for energy management and downloadable computer software for energy management, namely, BEMS (building energy management system), FEMS (factory energy management system) and HEMS (home energy management system); energy storage apparatus comprised of batteries; electric power compensators, namely voltage regulators; downloadable visualization software for creating and uploading visual data for use in local and remote automatic and computer controlled processes; high-voltage direct current systems (HVDC systems) comprised of direct current converters, [ batteries and voltage regulators; ] power control unit (PCU), namely, power controllers; power conditioning system comprised of transient voltage surge suppressors with power conditioning technology, power line conditioners and voltage stabilizers; programmable logic controllers; recorded computer operating system software for use in production planning and control, and data processing and analysis; computer operating programs, recorded; computerized supervisory and data acquisition systems comprised of data processing equipment, interfaces and peripheral devices for computers and computer hardware; electronic servo motor controllers; gas-insulated switches, electric; [ electrical components in the nature of electric contactors, namely, magnetic contactors; ] electric switches, namely, high voltage switchgears, electric; electric switches; electronic motor protection electric relays; electric meters, namely, watt hour meters; switchboards; transformers; electrical distribution circuit boards for industrial purposes; remote control telemetering machines and instruments for water supply and drainage systems, namely, water filter controllers, water meters and water level indicators; inverters; air circuit breakers; earth leakage circuit breakers; circuit breakers for wiring; vacuum circuit breakers; electric control apparatus in the nature of electronic controllers for railway automatic fare collection; photovoltaic cell apparatus for photovoltaic power generation, namely, photovoltaic cells; electric power converters used in solar power generation; electricity current limiters; battery chargers for electric cars; electric relays for electric cars; batteries for electric cars; controllers for electric cars, namely, electronic servo motor controllers [ ,cruise controls for motor vehicles and control units for regulating start-up electrical motors ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 9, 2026NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
May 19, 2026LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
May 17, 2026COC.CORRECTION UNDER SECTION 7 - PROCESSED—
May 17, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 21, 2025LIMGLIMITATION OF GOODS RECEIVED FROM IB—
May 7, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 12, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 12, 2024FIMPFINAL DISPOSITION PROCESSED—
Apr 9, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 9, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 9, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 24, 2023GPNXNOTIFICATION PROCESSED BY IB—
Oct 24, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 24, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 4, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 4, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 4, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 18, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 14, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 13, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 13, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 1, 2023RFNPREFUSAL PROCESSED BY IB—
Jul 12, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 11, 2023RFRRREFUSAL PROCESSED BY MPU—
Jun 7, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 6, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 23, 2023DOCKASSIGNED TO EXAMINER—
Jan 9, 2023CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Dec 4, 2022CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Oct 25, 2022MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 21, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 20, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance