USPTO serial 79353956
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Batteries, namely, batteries for storing energy produced by means of solar technology or wind power; fuel cells; accumulators for photovoltaic power, accumulators for wind power; batteries for the field of building technology for storing electrical energy produced by means of solar technology or wind power; apparatus and instruments for accumulating electricity; apparatus and instruments for accumulating and storing electricity; apparatus and instruments for switching the distribution of electricity; electrical cells and batteries; batteries, namely, power units; uninterruptible electrical power supply apparatus, storage batteries for storing electricity produced by means of solar technology or wind power | ACTIVE | — |
| 011 | Heating apparatus, namely, space heating apparatus, electric heating apparatus, namely, space heating apparatus, heating installations, in particular floor heating apparatus, heating elements, heating plates, namely, hot plates, radiators, central heating radiators, and radiant heaters, namely, wall and ceiling radiators; ceiling radiator profiles being structural parts of radiators; heating installations, in particular wall, ceiling and floor heating; coils being replacement parts of heating and cooling installations; steam generating installations, steam accumulators, pressure water tanks being hot water tanks, heat accumulators, air heaters, air filters for ventilating apparatus and furnaces, air conditioning filters, water filters; heat pumps, heat regenerators being heat generators, heat accumulators, heat exchangers, other than parts of machines, hot water apparatus being hot water tanks, hot water heating installations, heating boilers, feed devices being structural parts for heating boilers, connecting fittings being structural and replacement parts for radiators and heating installations; solar thermal collectors, and heating installations consisting predominantly of solar collectors and structural and replacement parts therefor; air ventilation apparatus and instruments and air-conditioning installations, and structural and replacement parts for ventilation and air-conditioning installations, namely, ventilation apparatus and fans, air-cooling apparatus, air-filtering installations, filters for air conditioning; thermostatic valves being structural and replacement parts of heating installations and pressure regulators for water installations, valves which are structural and replacement parts of installations for heating, thermostatic valves; regulating and safety fittings for thermostatic valves being structural and replacement parts and for heating installations | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 30, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 9, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 9, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 3, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 3, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 3, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 18, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 18, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 28, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 21, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 21, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 21, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 21, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jun 21, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jun 18, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 9, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 8, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 8, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 8, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 28, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 28, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 31, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 30, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 20, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 8, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 4, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 3, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |