USPTO serial 79354081
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Railway material of metal, namely, metallic materials for railway tracks, materials of metal for railway construction, metal railway crossovers; sleepers of metal, namely, railway sleepers; goods of common metal and their alloys for building or goods of common metal and their alloys, namely, prestressing and reinforcing steel, anchoring and connecting elements in the nature of metal fastening anchors, structural joint connectors of metal, pre-stressing steel for concrete ties, rail fasteners in the nature of railroad ties of metal; buildings, transportable, of metal; cables and wires of metal, non-electric; ironmongery, namely, iron ores, iron, unwrought or semi-wrought, cast iron, pig iron; small items of metal hardware, namely, springs, washers, metal brackets for general use, camping springs for railway fastenings; pipes and tubes of metal; tubbing of metal; beams of metal; ingots of common metal; building materials in the form of metal sheets; cotter pins of metal; reinforcing materials, of metal, for concrete; metal fibers in the nature of metal reinforcing for concrete and pre-stressing materials for concrete in the nature of steel rebars, rods, and mesh used for strengthening and reinforcing concrete structures; shuttering of metal in the nature of metal formwork materials for concrete in the nature of formwork for holding steel rebars, rods, and mesh used for strengthening and forming reinforcing concrete structures; sheets and plates of metal in the nature of steel plates; wire rope; brackets of metal for building; railway sleepers of metal; railway points of metal; metal rail connectors in the nature of railroad ties of metal; latticework of metal; metal staples for construction or industrial use; poles of metal for electric power lines, namely, power line pylons of metal, pylons of metal; cable junction sleeves of metal; nuts of metal; nails of metal being metal fasteners; metal lintel; posts of metal; drain pipes of metal; eye bolts; steel buildings in the nature of transportable buildings of metal; hardware pins of metal; posts of metal for power lines; metal shims | ACTIVE | — |
| 007 | Machines and machine tools for concrete processing, namely, machines for production of concrete ties, concrete mixers, concrete pumps, concrete finishing machines, concrete stressing and de-stressing machines, concrete curing machines; machines for the manufacture of precast concrete parts, namely, railway sleepers and precast slabs for roadways and special applications; motors, other than for land vehicles; machine coupling and transmission components, except for land vehicles | ACTIVE | — |
| 017 | Plastic fibers for concrete | ACTIVE | — |
| 019 | Pitch, tar, bitumen and asphalt; concrete building materials, not of metal, namely, blocks, bricks, posts, slabs, and panels; concrete sleepers, namely, concrete track and turnout sleepers; plastic sleepers for tracks and switches; concrete components, namely, prefabricated slabs for roadways and special applications; railway sleepers, not of metal; masts, not of metal, namely, non-metal utility poles, concrete poles for use as building materials; posts, not of metal, for power lines; rigid pipes, not of metal, for building; posts, not of metal; cement slabs; non-luminous and non-mechanical signs, not of metal; buildings, transportable, not of metal | ACTIVE | — |
| 037 | building construction for rail infrastructure projects for ballasted tracks and ballast less tracks; structural installation and building construction for rail infrastructure projects in the nature of rail track systems on concrete and asphalt surfaces; installation services relating to tracks and rails; machinery installation, maintenance and repair; repair of tracks and railways; construction consultancy | ACTIVE | — |
| 042 | Engineering consultancy services; surveying; research in the field of technology in the nature of development of new technology for others in the field of railways and rail track systems and mechanical engineering research; conducting technical project studies, namely, conducting of feasibility studies in the field of new technologies in the field of railway infrastructure, especially trackwork; technical planning and development in the nature of planning and design of ballasted and non-ballasted tracks | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 13, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 23, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 31, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 31, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 7, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 7, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| May 7, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 22, 2024 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Apr 3, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 3, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 4, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 26, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 20, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 7, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 7, 2024 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 31, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 31, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 16, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 11, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 11, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jan 11, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 11, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 2, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 1, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 1, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 24, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 2, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 2, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 11, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 10, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 3, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 8, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 4, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 3, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |