Drawing for RAILONE

USPTO serial 79354081

RAILONE

Reviewed by CopyMark Law Group

Reg. 7376457Status 700Registered
Filing date
Status date
Registration date
May 7, 2024
Examiner
O'BRIEN, JENNIFER LYNN
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RAILONE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Railway material of metal, namely, metallic materials for railway tracks, materials of metal for railway construction, metal railway crossovers; sleepers of metal, namely, railway sleepers; goods of common metal and their alloys for building or goods of common metal and their alloys, namely, prestressing and reinforcing steel, anchoring and connecting elements in the nature of metal fastening anchors, structural joint connectors of metal, pre-stressing steel for concrete ties, rail fasteners in the nature of railroad ties of metal; buildings, transportable, of metal; cables and wires of metal, non-electric; ironmongery, namely, iron ores, iron, unwrought or semi-wrought, cast iron, pig iron; small items of metal hardware, namely, springs, washers, metal brackets for general use, camping springs for railway fastenings; pipes and tubes of metal; tubbing of metal; beams of metal; ingots of common metal; building materials in the form of metal sheets; cotter pins of metal; reinforcing materials, of metal, for concrete; metal fibers in the nature of metal reinforcing for concrete and pre-stressing materials for concrete in the nature of steel rebars, rods, and mesh used for strengthening and reinforcing concrete structures; shuttering of metal in the nature of metal formwork materials for concrete in the nature of formwork for holding steel rebars, rods, and mesh used for strengthening and forming reinforcing concrete structures; sheets and plates of metal in the nature of steel plates; wire rope; brackets of metal for building; railway sleepers of metal; railway points of metal; metal rail connectors in the nature of railroad ties of metal; latticework of metal; metal staples for construction or industrial use; poles of metal for electric power lines, namely, power line pylons of metal, pylons of metal; cable junction sleeves of metal; nuts of metal; nails of metal being metal fasteners; metal lintel; posts of metal; drain pipes of metal; eye bolts; steel buildings in the nature of transportable buildings of metal; hardware pins of metal; posts of metal for power lines; metal shimsACTIVE
007Machines and machine tools for concrete processing, namely, machines for production of concrete ties, concrete mixers, concrete pumps, concrete finishing machines, concrete stressing and de-stressing machines, concrete curing machines; machines for the manufacture of precast concrete parts, namely, railway sleepers and precast slabs for roadways and special applications; motors, other than for land vehicles; machine coupling and transmission components, except for land vehiclesACTIVE
017Plastic fibers for concreteACTIVE
019Pitch, tar, bitumen and asphalt; concrete building materials, not of metal, namely, blocks, bricks, posts, slabs, and panels; concrete sleepers, namely, concrete track and turnout sleepers; plastic sleepers for tracks and switches; concrete components, namely, prefabricated slabs for roadways and special applications; railway sleepers, not of metal; masts, not of metal, namely, non-metal utility poles, concrete poles for use as building materials; posts, not of metal, for power lines; rigid pipes, not of metal, for building; posts, not of metal; cement slabs; non-luminous and non-mechanical signs, not of metal; buildings, transportable, not of metalACTIVE
037building construction for rail infrastructure projects for ballasted tracks and ballast less tracks; structural installation and building construction for rail infrastructure projects in the nature of rail track systems on concrete and asphalt surfaces; installation services relating to tracks and rails; machinery installation, maintenance and repair; repair of tracks and railways; construction consultancyACTIVE
042Engineering consultancy services; surveying; research in the field of technology in the nature of development of new technology for others in the field of railways and rail track systems and mechanical engineering research; conducting technical project studies, namely, conducting of feasibility studies in the field of new technologies in the field of railway infrastructure, especially trackwork; technical planning and development in the nature of planning and design of ballasted and non-ballasted tracksACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 13, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED
Nov 23, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Oct 31, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB
Oct 31, 2024FIMPFINAL DISPOSITION PROCESSED
Aug 7, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
May 7, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
May 7, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 22, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Apr 3, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Apr 3, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Mar 4, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Feb 26, 2024GPNXNOTIFICATION PROCESSED BY IB
Feb 20, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 7, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Feb 7, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Jan 31, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jan 31, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jan 16, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jan 11, 2024XAECEXAMINER'S AMENDMENT ENTERED
Jan 11, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jan 11, 2024GNEAEXAMINERS AMENDMENT E-MAILED
Jan 11, 2024CNEAEXAMINERS AMENDMENT -WRITTEN
Nov 2, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Nov 1, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 1, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 24, 2023RFNTREFUSAL PROCESSED BY IB
May 2, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
May 2, 2023RFRRREFUSAL PROCESSED BY MPU
Mar 11, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Mar 10, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 3, 2023DOCKASSIGNED TO EXAMINER
Nov 8, 2022MAFRAPPLICATION FILING RECEIPT MAILED
Nov 4, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 3, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance