Drawing for VIROC

USPTO serial 79354538

VIROC

Reviewed by CopyMark Law Group

Reg. 7646260Status 700Registered
Filing date
Status date
Registration date
Jan 14, 2025
Examiner
THOMAS, JULIE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with VIROC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
019Monuments, not of metal; concrete panels; building materials, namely, boards made of wood particles; non-metallic temporary fencing; acoustic panels, not of metal, namely, non- metal building panels incorporating acoustic insulation; wood panelling; non-metal fencing panels; building panels, not of metal; building materials, namely, particleboard; wooden floor boards; wall linings, not of metal, for building; ceiling boards, not of metal; fibreboard for building; building materials, namely, fiberboard; partitions, not of metal, for building; non-metal partitions for building; partitions being non- metallic building materials; cementitious protective coatings for building purposes; cements for building; ready-to-use cement for building purposes; cementitious waterproofing coatings for building purposes; fireproof cement coatings; concrete coatings for use on building facades, ceilings and floor; non-metal cladding board for building; non-metal cladding for building; building materials, namely, cement-based coatings for use on roofs, walls and floor; roofing underlayment; coverings, not of metal, for building, namely, non-metal roof coverings; flashing, not of metal, for building; non-metal suspended ceiling panels; fibre boards of wood fibre bonded with resin and particle boards for building; wall panelling made of non-metallic materials; prefabricated non-metal walls; pre-fabricated interior walls of non- metallic materials; non-metal walls; moveable walls made of non-metallic materials, namely, prefabricated non-metal walls; spacers for building purposes in the nature of panels of fibre-reinforced cement; wood-fiber reinforced cement boards being cement excelsior boards; concrete floors; laminate flooring, not of metal; concrete walls for building; non- metal cladding for ceilings; non-metal decking; facade panels of non-metallic materials for construction purposes; non-metal building fronts in the nature of non-metal exterior wall panels; non-metal cladding for facades for construction purposes; facade elements in the nature of panels of non-metallic materials for construction purposes; non-metal facade panels for construction purposesACTIVE
037Construction of public facilities in the nature of cultural and recreational facilities; erecting of housing areas; construction of public works, namely, roads, expressways, tunnels, ports, docks, dikes, canals, piers and bridges; building construction of houses, offices, and gyms; building construction information; construction of parts of buildings; provision of construction information; building construction supervision; construction grading services; building sealing; construction of civil engineering structures; residential and commercial building construction; general building contractor services; building construction supervision; construction of buildings and other structures; erection of formwork for building and construction; building construction consultancy; advisory services relating to the construction of buildings and other structures in the nature of civil engineering structures; consultancy, information and advisory services relating to the construction of public works; installation of coloured panels in building facias; erection of curtain walling; construction of curtain wallsACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 26, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Sep 26, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 26, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Aug 15, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jul 12, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB
Jul 12, 2025XXCRGENERIC MADRID TRANSACTION CREATED
May 8, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED
Apr 14, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jan 14, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Jan 14, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 26, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Nov 26, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 20, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Oct 30, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Oct 25, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Oct 25, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 25, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
May 6, 2024GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
May 6, 2024GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 6, 2024CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 29, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Apr 10, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Apr 10, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Feb 2, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Feb 2, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 2, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 28, 2023RFNTREFUSAL PROCESSED BY IB
Aug 4, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Aug 4, 2023RFRRREFUSAL PROCESSED BY MPU
Jun 29, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jun 28, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 27, 2023DOCKASSIGNED TO EXAMINER
Nov 18, 2022MAFRAPPLICATION FILING RECEIPT MAILED
Nov 14, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 10, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance