Drawing for HY-LOK

USPTO serial 79354544

HY-LOK

Reviewed by CopyMark Law Group

Reg. 7301507Status 700Registered
Filing date
Status date
Registration date
Feb 13, 2024
Examiner
EISNACH, MICHAEL PATRICK
Law office
Historical data usage

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with HY-LOK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Steel pipes; Stainless steel pipes; Metal pipes and metal fittings therefore; Tubes of metal; Pipework of metal; Drain pipes of metal; Water-pipes of metal; Ferrules of metal; Valves of metal, other than parts of machines; Pipe coupling of metal; Pipe joints of metal; * flexible hose muffs of metal * [ Metal pipe fittings ] ; Flanges of metal; * pipe couplings and joints of metal * [ Metal hose fittings ] ; Valves of metal, other than for machines; Connectors of metal for plumbing; Fittings of metal for pipesACTIVE
007Tube deburring machine for metalworking; Tube bending machine for metalworking; Tube cutting machine for metalworking; Tube fitting pre-assembly machine for metalworking; Swaging machines; Air manifolds for construction equipment engines; Air pipe module being parts for engines other than for vehicles; Air manifolds for ship engines; Air pipe module being parts for ship engines; Filters being parts of engines; Valves other than for land vehicles being parts of machines; Valves for semiconductor manufacturing apparatus, namely, valves being parts of semiconductor manufacturing machines; Valves being parts of machines; Valves being parts of machines, other than for vehicles; Valves other than for vehicles being parts of machines; Bushings being parts of machines; Pressure valves being parts of machines; Control valves for regulating the flow of gases and liquids being parts of machines; Gate valves being parts of machine other than for land vehicles; Globe valves being parts of machine other than for land vehicles; Couplings other than for land vehicles being parts of machines; Regulators being parts of machines; Back pressure valves being parts of machines; Ball valves being parts of machines; Fluid couplings being parts of machines; Air manifolds for engines for land vehicles; Air pipe module being parts for engines for land vehiclesACTIVE
009Apparatus for analysing gases; Air analysis apparatus; Thermostatically controlled valves; Ionization apparatus for scientific or laboratory use and not for the treatment of air or water; [ Electrolytic cells, namely, ] electrolysis apparatus for laboratory use; Remote control telemetering machines and apparatus; Electric control valves for controlling the flow of oil in pipelinesACTIVE
011Thermostatic valves being parts of heating installations; Air valves for steam heating installations; Desalination plants; Oil-scrubbing apparatus, namely, oil purifying installations; Drying apparatus for chemical processing; Valves for gas scrubbing apparatus; Valves for air filtering installations; Valves for desalination plants; Valves for water purification installations; Valves for electric generator using atomic power; Valves for water intake apparatus in the nature of water sterilizers; Level controlling valves in tanks, namely, level controlling valves being plumbing fittings; Gas cocks being plumbing fittings; Pipe-water connections being parts of sanitary installationsACTIVE
012Parts and fittings for plumbing featuring railway freight cars, namely, hydraulic plumbing systems being structural parts of railway freight cars; Flanges for railway wheel tires; Valves for vehicle tires; [ Fittings and ] valves for the hydraulic system in ladder vehicles, namely, air suspension valves for controlling suspension height for ladder vehicles; Bushings for construction vehicles; Couplings for construction vehiclesACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 24, 2026NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED
Mar 6, 2026LIMELIMITATION FROM THE IB EXAMINED AND ENTERED
Mar 5, 2026COC.CORRECTION UNDER SECTION 7 - PROCESSED
Mar 5, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Feb 21, 2025LIMGLIMITATION OF GOODS RECEIVED FROM IB
Jun 11, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB
May 15, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB
May 15, 2024FIMPFINAL DISPOSITION PROCESSED
May 13, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Feb 13, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Feb 13, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 7, 2024ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED
Dec 15, 2023CHPBPOST PUBLICATION AMENDMENT - ENTERED
Dec 13, 2023APETASSIGNED TO PETITION STAFF
Nov 6, 2023EPPATEAS POST PUBLICATION AMENDMENT RECEIVED
Sep 18, 2023ETOFEXTENSION OF TIME TO OPPOSE RECEIVED
Aug 29, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Aug 29, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 28, 2023GPNXNOTIFICATION PROCESSED BY IB
Aug 9, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Aug 9, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Aug 9, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jul 21, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jul 19, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jul 19, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 19, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 11, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Jul 11, 2023ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS
Jul 11, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 11, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jul 11, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Jul 11, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
Jul 4, 2023RFNTREFUSAL PROCESSED BY IB
Jun 10, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jun 10, 2023RFRRREFUSAL PROCESSED BY MPU
Apr 27, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Apr 26, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 17, 2023DOCKASSIGNED TO EXAMINER
Nov 18, 2022MAFRAPPLICATION FILING RECEIPT MAILED
Nov 14, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 10, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance