USPTO serial 79354695
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
FR
FR
FR
FR
FR
FR
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Downloadable software and software applications for mobile phones, electronic devices, handheld computers, namely, software for controlling the network operation of connected apparatus linked to electrical apparatus and installations, lighting apparatus and installations, and signaling apparatus and installations, and for monitoring of goods, persons and patients for safety purpose, and for monitoring access control of buildings and rooms, monitoring home automation systems, monitoring building automation systems, and for promoting energy efficiency and energy saving by using connected electronic devices | ACTIVE | — |
| 042 | Technical consultancy for the design for others of electrical installations and devices and energy supply installations, and for the inspection and checking of said devices and installations for quality control purposes; analysis and testing services relating to electrical engineering apparatus; testing of apparatus in the field of electrical engineering; testing and quality inspection, namely, product quality testing of electric and electronic apparatus and instruments; energy auditing; advice with respect to energy saving, namely, consulting services in the fields of energy consumption to improve energy efficiency; consultancy services in the fields of energy measurement to improve energy efficiency; advisory services for others in the field of designing electrical apparatus for improving energy efficiency; technical consulting services in connection with energy saving measures in the nature of energy measurement to improve energy efficiency; engineering services in the field of energy supply systems; technological consultancy services in the field of alternative energy production; software as a service (SAAS) services featuring software for controlling and monitoring the network operation of connected apparatus linked to electrical apparatus and installations, lighting apparatus and installations, and signaling apparatus and installations, and for monitoring of goods, persons and patients for safety purposes, and for monitoring access control of buildings and rooms, monitoring home automation systems, monitoring building automation systems, and for promoting energy efficiency and energy saving by using connected electronic devices; design, installation and updating of software in the field of energy efficiency; research and development of new products for third parties in the field of energy efficiency; technical project studies, namely, conducting scientific feasibility studies in the field of energy efficiency; scientific research and scientific information services in the field of environmental protection; environmental testing and inspection services; energy efficiency monitoring of buildings and electrical apparatus, namely, energy auditing; rental of meters for the recording of energy consumption | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 23, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 11, 2024 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| May 11, 2024 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| May 6, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 6, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Feb 6, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 21, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Nov 21, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 21, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 1, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 1, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 1, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 28, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 19, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 2, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 2, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 2, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 31, 2023 | RFNP | REFUSAL PROCESSED BY IB | — |
| May 9, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 8, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 20, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 19, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 11, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 18, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 14, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 10, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |