Drawing for WEIDMÜLLER U-SENSE VIBRATION

USPTO serial 79355000

WEIDMÜLLER U-SENSE VIBRATION

Reviewed by CopyMark Law Group

Reg. 7251325Status 700Registered
Filing date
Status date
Registration date
Dec 26, 2023
Examiner
BENMAMAN, ALICE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with WEIDMÜLLER U-SENSE VIBRATION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Electric/electronic connecting and installation devices, namely, sensors for machine condition monitoring, and systems comprised of sensors, gateways and USB sticks for machine condition monitoring, electronic components in the nature of sensors for machine condition monitoring and electric/electronic modules for machine condition monitoring; electric connecting systems comprised of sensors, gateways and USB sticks for machine condition monitoring; electronic power supplies; Ethernet repeaters, gateway routers, input/output systems consisting of electric and electronic devices, namely, machine condition monitoring systems, control units for sensors for machine condition monitoring, and downloadable software for the remote control of industrial operating processes; USB (universal serial bus hardware) and sensor systems consisting of electric and electronic devices, namely, sensors, gateways and USB sticks for machine condition monitoring, control units for machine condition monitoring and downloadable software for monitoring and collecting data of electric conditions and vibrations; downloadable software and downloadable mobile applications and digital control algorithms all for recording, analyzing and monitoring energy flows, operating and process data; computers, computer display screens; interfaces and peripheral devices for computers; downloadable computer software and downloadable computer applications all for controlling, sensing, measuring, signaling, detecting, and checking control apparatus and instruments, namely, machine condition monitors; electric devices and electronic components for remote data transmission and remote diagnosis, namely, sensors, gateways and USB sticks for machine condition monitoring; data storing apparatus, namely, apparatus for recording, transmission, processing and reproduction of sound, images or data; downloadable software for machine condition monitoring; downloadable mobile applications for machine condition monitoring; downloadable digitalization software for machine condition monitoring; cloud servers being computer servers; downloadable software and downloadable computer applications both for providing cloud computing services and for monitoring cloud networks; downloadable artificial intelligence software for machine condition monitoring; downloadable artificial intelligence computer applications for machine condition monitoring; downloadable machine learning software and downloadable mobile applications both for machine condition monitoring; downloadable software and downloadable mobile applications for machine learning for machine condition monitoring; downloadable software and downloadable mobile applications both for producing, administrating and developing models; downloadable databases in the field of machine condition monitorsACTIVE
042Development, design, implementation, maintenance, servicing and updating of software in the field of machine condition monitoring; providing temporary use of online non-downloadable applications for machine condition software; information technology [IT] consultancy; cloud services, namely, cloud storage services for electronic data in the field of machine condition monitoring; software as a service (SAAS) services featuring software for machine condition monitoringACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 23, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Mar 28, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB
Mar 27, 2024FIMPFINAL DISPOSITION PROCESSED
Mar 26, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Dec 26, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Dec 26, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 10, 2023GPNXNOTIFICATION PROCESSED BY IB
Oct 10, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Oct 10, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 20, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Sep 20, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Sep 20, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Sep 5, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jul 26, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jul 25, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 25, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 15, 2023RFNTREFUSAL PROCESSED BY IB
Jan 25, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jan 25, 2023RFRRREFUSAL PROCESSED BY MPU
Nov 26, 2022RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Nov 25, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 18, 2022MAFRAPPLICATION FILING RECEIPT MAILED
Nov 15, 2022DOCKASSIGNED TO EXAMINER
Nov 14, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 10, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance