USPTO serial 79355654
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 004 | electrical energy; electrical energy from renewable sources; fuels, namely, carburants; biofuels | ACTIVE | — |
| 037 | Building construction services; advisory services relating to the maintenance of buildings, namely, the installation of generators; advisory services relating to building construction, namely, the installation of hydraulic equipment; advisory services relating to building construction, namely, the installation of power plants; advisory services relating to the installation of lighting apparatus; advisory services relating to the installation of heating and cooling apparatus; advisory services relating to the installation of solid fuel heating systems; repair services for domestic electrical appliances; boiler repair services; repair services for electronic business equipment; repair of heat exchangers; service station services for the repair of vehicles; repair services for electric generators and wind turbines; maintenance and repair of utilities in buildings; consulting services relating to the repair of civil engineering structures; consulting services relating to the physical maintenance and repair of mechanical and electrical equipment; repair and maintenance of building scaffolds, working and building platforms; installation of solar powered systems; installation of hydropower systems; installation of wind power systems; construction of geothermal energy installations; power infrastructure construction; maintenance and repair of energy generating installations; maintenance, servicing and repair of power generating apparatus and installations; maintenance and repair of gas turbines; maintenance and repair of gas and electricity installations; maintenance and repair of oil and gas storage installations; installation of power generating apparatus | ACTIVE | — |
| 039 | Electricity distribution; distribution of gas; transmission of oil or gas through pipelines; distribution of heat; distribution of electricity to households; electricity distribution via cables; distribution of energy; distribution of renewable energy; distribution and transmission of electricity; electricity distribution, namely, supply of electricity; gas supplying; storage of liquids | ACTIVE | — |
| 040 | Electricity generating; generation of electricity from geothermal energy; generation of electricity from solar energy; generation of power; production of electrical power from renewable sources; production of electrical power from renewable sources, namely, production of hydroelectric power; production of energy by power plants; production of energy by nuclear power plants; generation of gas and electricity; consultancy services relating to the generation of electrical power; information services relating to the generation of electricity from wave energy; air and water conditioning and purification; food and drink preservation; generation of electrical power using carbon sequestration | ACTIVE | — |
| 042 | Electrical engineering services; engineering services in the field of environmental technology; engineering services for the gas industry; Technology advisory services relating to design engineering; engineering services in the field of energy technology; engineering services relating to energy supply systems; analysis and testing services relating to electrical engineering apparatus to assure compliance with industry standards; engineering services in the field of electrical power and natural gas production; engineering services relating to gas transport and supply systems | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 6, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 6, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 6, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 5, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 5, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 19, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 19, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 19, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 29, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 29, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 29, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 13, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 3, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 2, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 2, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 24, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 2, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 2, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 11, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 10, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 2, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 22, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 18, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 17, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |