USPTO serial 79355661
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Buildings, transportable, of metal; transportable buildings of metal; structures for greenhouses being metal greenhouse frames; metal parts and components of greenhouses being metal greenhouse frames; modular metallic buildings for the installation of solar batteries; greenhouses of metal, transportable metal greenhouses | ACTIVE | — |
| 019 | Buildings, transportable, not of metal; building glass; non-metallic construction materials, namely, for greenhouses; structures for greenhouses being non-metal greenhouse frames; non-metallic parts and components of greenhouses being non-metal greenhouse frames; building glass for use in greenhouses; insulating glass for building; non-metallic construction materials for installing solar cells being solar panel mounts not made of metal; transportable greenhouses not of metal | ACTIVE | — |
| 035 | Wholesale store and retail store services in the field of greenhouses, metal and non-metallic constructions, constructions and structures for greenhouses, parts of greenhouses, glass for building purposes, glass for use in greenhouses, insulating glass for building and constructions of metal for installing solar cells; import-export agency services for others in the field of greenhouses, metal and non-metallic constructions, constructions and structures for greenhouses, parts of greenhouses, glass for building purposes, glass for use in greenhouses, insulating glass for building and constructions of metal for installing solar cells; business project management services for construction projects; business planning and consultancy; business consultancy in the preparation of business plans | ACTIVE | — |
| 037 | The construction, repair, maintenance and installation of greenhouses, with metal and wooden frameworks, frameworks and structures for greenhouses, greenhouse parts and metal frameworks for the installation of solar panels; the construction, repair, maintenance and installation of greenhouse heating, cooling, boiler, expansion and co2 systems, water storage systems, water pumps, lighting, heating, steam production, heating, cooling, drying, ventilation, and water supply systems, water purification systems, air conditioning systems, air ventilation systems, air purification systems, ventilators and solar collectors, and electro-technical systems; building construction management | ACTIVE | — |
| 042 | Engineering services for the technical design and planning of systems for heating, lighting, climate control, and water purification; engineering services for the planning and related consultancy in the field of design and construction of greenhouses and growth cells, energy saving and energy efficiency | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 9, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 21, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 21, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 23, 2024 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jul 17, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 16, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Apr 16, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 30, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 30, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 30, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 10, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 10, 2024 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 10, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 30, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 26, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 12, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 11, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 11, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 28, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 5, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 5, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 30, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 29, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 26, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 22, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 18, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 17, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |