USPTO serial 79356138
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Mixing installations, namely, concrete mixers; conveyors being machines for the construction industry; fixed mountable and convertible concrete pumps; concrete pumps for mounting on chassis, vehicles and crawler tracks; machines for distribution of concrete, namely, concrete placing booms; truck-mounted concrete pumps; parts and fittings for the aforesaid goods, in particular machines chassis, tracks for crawler cranes; mixing machines; mobile agitators for circulating liquid media; earth-moving apparatus land vehicles, namely, hydraulic excavators, rail-road excavators, wheel loaders, bulldozers, crawler loaders, cable excavators, wheeled excavators, crawler excavators, mining excavators, articulated dump trucks, mining trucks, telescopic handlers, crawler tractors, pipe layers, duty cycle crawler cranes, deep foundation machines; pile drivers; drilling machines and parts therefor; material handling apparatus, namely, wood handling apparatus, namely, wheel loaders for timber handling, bulldozers, crawler tractors, crawler cranes, cranes, crane booms, timber material handling machines for log handling, hydraulic excavator land vehicles, telescopic loaders, wheeled telescopic loaders, reach stackers for handling intermodal cargo containers; power-operated lifts and moving equipment, namely, pipe layers; crawler conveyor machines; crusher plants being machines; cranes, namely, tower cranes, automobile cranes, deck cranes, container cranes, mobile wharf cranes, crawler cranes, stacker cranes; machines and machine tools, in particular gear cutting machines, namely, gear shaping machines, roller milling machines, gear hobbing machines, and parts therefor, in particular gear cutting tools; recycling crushing installations being machines; machines for handling materials, namely, gantry robots, lift belts being parts of machinery, work piece storage systems being parts of machines, work piece pallet storage systems being parts of machines; hydraulic and electromechanical winches; belts for conveyors; slip rings for wind turbine generators; parts and accessories for the aforesaid goods, in particular chassis, diesel engines for cranes, exhaust gas treatment systems for diesel engines, diesel-hydraulic hybrid drives for cranes, electric motors for cranes, motor and engine control apparatus for cranes, actuators being parts of cranes, gear boxes not for land vehicles, comprised of pump drives, valves, cylinders and hydraulic components, equipment, namely, lifting gear being parts of cranes for digging, lifting and lowering of materials, working tools and attachment tools for digging, lifting, and lowering of materials, including buckets for digging, lifting, and lowering of materials, grippers for digging, lifting, and lowering of materials, shovels for digging, lifting, and lowering of materials, and crane booms as parts of cranes; parts and accessories for the aforesaid goods, in particular hydraulic quick-coupling systems for attachment tools, quick hitches, oscillation tools, hydraulic hammers, pipe tongs, cabins, ballast systems for cranes of all kinds, in particular for mobile cranes and crawler cranes, support systems, in particular for mobile cranes and truck-mounted concrete pumps, hydraulic quick-coupling systems for mounted tools and quick hitches | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 9, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 17, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 17, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 3, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 2, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Apr 2, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 16, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 16, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 13, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 27, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 27, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 27, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 8, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 10, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 9, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 9, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 31, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 9, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 9, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 29, 2023 | ATRV | ATTORNEY REVIEW COMPLETED | — |
| Apr 28, 2023 | LIME | LIMITATION FROM THE IB - REQUEST EXAM REVIEW | — |
| Mar 18, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 17, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 15, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 6, 2023 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Nov 29, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 25, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 24, 2022 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |