USPTO serial 79356633
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Bayerische Motoren Werke Aktiengesellschaft
DE
Other trademarks owned by Bayerische Motoren Werke Aktiengesellschaft
Bayerische Motoren Werke Aktiengesellschaft
DE
Other trademarks owned by Bayerische Motoren Werke Aktiengesellschaft
Bayerische Motoren Werke Aktiengesellschaft
DE
Other trademarks owned by Bayerische Motoren Werke Aktiengesellschaft
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines for the production of land vehicles and land vehicle parts; industrial robots | ACTIVE | — |
| 040 | Production of energy, namely, electricity, regenerative energy, solar energy, wind power, hydroelectric power and photovoltaic energy | ACTIVE | — |
| 041 | Education services, namely, providing classes, seminars, workshops in the field of land vehicle manufacturing, energy generation; training in the field of land vehicle manufacturing, energy generation; arranging and conducting of seminars for education and training purposes, namely, providing seminars in the field of land vehicle manufacturing, energy generation; arranging and conducting web seminars for education and training purposes, namely, providing web seminars in the field of land vehicle manufacturing, energy generation; training and further training consultancy, namely, training in the field of vehicle manufacturing and design and training consultancy in the nature of consulting services about education | ACTIVE | — |
| 042 | Scientific and technological services, namely, scientific research, engineering services; scientific research and development; industrial research in the field of land vehicles and energy generation; industrial research analysis, namely, computer systems analysis; development of new technology for others in the field of land vehicles, alternative energy generation; development of manufacturing methods, namely, testing of functionality of machines used in the manufacturing of land vehicles; development of industrial products; development of industrial processes, namely, engineering services, material testing and quality control of goods and services; construction project development services, namely, engineering services; engineering design and consultancy; technical planning of plant and production process, namely, engineering design services; technical planning of manufacturing process, namely, engineering design services; construction drafting; technical consultancy relating to product development, namely, consulting in the field of product development for others; consulting in the field of engineering design; quality control for others; consulting in the field of environmental protection | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 7, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 15, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 15, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 4, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 4, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 4, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 21, 2024 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| May 1, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 1, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 19, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 19, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 28, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 28, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 9, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 9, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 9, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 9, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 9, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 9, 2024 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Dec 26, 2023 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Aug 22, 2023 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Aug 7, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 4, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 4, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 4, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 7, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 16, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 16, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 21, 2022 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 20, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 20, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 6, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 2, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 1, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |