USPTO serial 79356749
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
NEUMAN & ESSER Verwaltungs- und Beteiligungsgesellschaft mbH
DE
Other trademarks owned by NEUMAN & ESSER Verwaltungs- und Beteiligungsgesellschaft mbH
NEUMAN & ESSER Verwaltungs- und Beteiligungsgesellschaft mbH
DE
Other trademarks owned by NEUMAN & ESSER Verwaltungs- und Beteiligungsgesellschaft mbH
NEUMAN & ESSER Verwaltungs- und Beteiligungsgesellschaft mbH
DE
Other trademarks owned by NEUMAN & ESSER Verwaltungs- und Beteiligungsgesellschaft mbH
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Superchargers, namely, electric compressors for machines; piston compressors; milling machines, namely, grinding mills for solid material; milling machines and grinding machines for the treatment of ceramics and metals; grinding mills for chemical processing; compressors control mechanisms being parts of machines; compressor regulation mechanisms being parts of machines; parts for compressed-air machines, namely pressure switches and sensors for controlling and regulating hydraulic or pneumatic systems sold as an integral component of injection molding machines; gaskets as machine parts, namely, gaskets for internal combustion engines; valves being parts of machines; parts for compressed air tools, namely compressors; electrolysis machines for generating hydrogen to be used for energy and parts thereof; hydrogen dispensing pumps for services station; machines for generating hydrogen by electrolysis; devices for the storage of energy, namely, pressure vessels for hydrogen storage as parts of electricity generators or machines for generating hydrogen by electrolysis, namely, gas diverters consisting of a pump, storage and refilling tank, pre-heater, vaporizer, recuperator, condenser, valves | ACTIVE | — |
| 009 | Downloadable manufacturing software to monitor, control, diagnose, and track machine performance and operations, in the fields of mechanical process technology and hydrogen generation; computer hardware; computers; electronic black boxes for recording data; apparatus and instruments for science, research, detection, testing, inspection, namely, automated process control system comprised of logic based hardware used to monitor the status of industrial machinery in the nature of compressors for the purposes of monitoring and diagnosing compressor machine performance and providing maintenance and repair support; apparatus and instruments for conducting, interrupting, transforming, accumulating, regulating or controlling the distribution or use of electricity; apparatus and instruments for recording, transmitting, reproducing or processing sound, images or data; electrical measuring apparatus, namely, clamp meters for measuring electricity; electrical apparatus for controlling electrical power, namely, electric resistors, electrical controllers, electric control panels, electrical controlling devices; electrical apparatus for remote ignition, namely, a keyless ignition switch system for automotive vehicles comprised of a microprocessor, electronic signal receiver, and keyfob with electronic signal transponder; electrical and electronic monitoring equipment, except for medical purposes, namely, energy meters and submeters for tracking and monitoring energy use, electronic monitors and monitor modules for monitoring electric current and electrical signals; gas analyzers, namely, apparatus for analyzing gases; air analyzers, namely, air analysis apparatus; heat control equipment in the nature of electric control devices for heating management; electrical equipment for remote control of industrial operations in industrial plants; boiler control instruments; electric control panels; electric distribution systems, namely, power distribution panels; galvanic batteries; downloadable computer programs for use in database management and use as a spreadsheet; recorded computer operating programs; electric accumulators of steam; equipment and devices for the storage of energy, namely, supercapacitors for energy storage; devices for the storage of energy, namely, electricity storage apparatus using hydrogen in the nature of hydrogen fuel cells | ACTIVE | — |
| 037 | Installation, maintenance and repair of machines and parts thereof, namely compressors, milling machines, classifier machines in the nature of grinding mills and sorting machines; maintenance services of computer hardware | ACTIVE | — |
| 042 | Construction drafting; remote monitoring of the functioning of electrical equipment in the nature of online machine condition monitoring, namely, computer-aided technical monitoring and control of compressors for machines, milling machines, machines for sorting solid materials and removing non-conforming materials, machines for sorting ceramic and metal materials, grinding mills; technical consulting, technical services and technical advice, namely, diagnostics services for compressors for machines, milling machines, grinding machines; scientific and technological services, namely, research and design in the field of compressor machines, performance of compressor machines, maintenance requirements of compressor machines; industrial research in the field of compressor machines and hydrogen generation; industrial design services; engineering; computer-aided engineering services for others; quality control for others; authentication services in the field of compressor machines; computer hardware and software design and development; computer software maintenance; rental of computer software for monitoring performance of compressor machines, milling machines, grinding machines, machines for sorting solid materials and removing non-conforming materials, machines for sorting ceramic and metal materials; information technology consultancy relating to installation, maintenance and repair of computer software; technical consulting related to energy saving measures to improve energy efficiency; technological consulting services in the field of alternative energy generation; industrial design; platform as a service (PAAS) featuring computer software platforms for use in database management, for use as a spreadsheet, for use in monitoring and diagnosing machine performance and analytics in the field of compressor machines and hydrogen generating equipment; software as a service (SAAS) services featuring software for database management, for use as a spreadsheet, for use in monitoring and diagnosing machine performance and analytics in the field of compressor machines and hydrogen generating equipment | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 26, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 26, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 9, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 9, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 8, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 20, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 20, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 20, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 5, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 5, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 5, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 5, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 5, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 3, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 2, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 2, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 1, 2023 | LIME | LIMITATION FROM THE IB - REQUEST EXAM REVIEW | — |
| Aug 12, 2023 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| May 31, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 2, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 2, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 13, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 12, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 17, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 7, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 3, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 1, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |